Duke Freeport- PT1602224
•
T M s • C I T Y • O r
COPPELL
,
Qp
'- 4
EARLY GRADING/EXCAVATION PERMIT
IN
RIGHT-OF-WAY/EASEMENT/PRIVATE PROPERTY
City Contractor
Date: Z/Z2 //,
❑ IA Grading plans provided and approved.
(Erosion Control must be installed prior to beginning work.)
❑ ❑ Tree Removal Permit from Parks&Recreation Dept.required.
❑ ❑ Hold Harmless Letter from the Property Owner/Engineer/Developer is attached.
Project Name/Location: I kts u, (070 5.0044‘treePC.)1` • Pty , ] OI9
General Contractor: jZ cb rt c4- or U QI I kd r hl
Permit issued to Company/Representative: iliQ eptoko 3lGn Li mi-ed PQ 4ner5bip
Address: Ill Zti 6:1110 s_phAy
Telephone#: Q7Z 3b I (o720 Emergency Telephone#: (3 ) 75/5— 0 3)
General Description of work(provide copy of approved plans):
C ts42Ctr (c%b• 1)‘\6‘ecf 5► e — ,a Li 1(115 {)a8 6aqua-lic 41
-) 51a-s1c 11e. 4 soi
i F rack acl-i ` � �nM14.s �excQUQi�c)r� -� Qu i 1 c11 Pad Iha ►�
5; u� �s s coni
.Was contact made with City and/or Utility Companies to locate existing utilities?
if NO,Reason: XYes ( No
rWas contact made with Parks&Recreation Dept.co •rning Tree Removal Perm
ts<.rvey5Jhroatied LA/ l' - - C 6 40,1.
if NO,Reason: _Wilt_Vy_ `ere X11 'IV (Yes
rls removal of existing street,alleys,or sidewalks necessary? Yes KNo D l`Td"
if YES,Attach Bore/Street Cut/Saw Cut Permit f'Q.r•`e `
.Is Floodplain Permit required? ('Yes 1No
if YES,Permit# or date of City Council variance ._
Early Grading/Excavation Permit Page 2
Representative(s) of the Contractor must adhere to all construction standards approved by
the City of Coppell, which includes but is not limited to: Erosion Control Ordinance,
compaction requirements (density tests will be required at the applicant's expense), Tree
Ordinance and barricading according to the Texas Manual on Uniform Traffic Control
Devices. Area(s) affected must be restored to as good condition as before the
commencement of work(grading,drainage,vegetation,and erosion control).
pAny work requiring closing of a lane of traffic,street,or alley must be approved
by the Engineering Dept. with notification to the following prior to
closing: Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Department @ 972-304-3679
rAttach barricade plan/trench safety plan of a lane or street closure is required.
Note: Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless
otherwise approved by City
Engineer.
rA 2%inspection fee for grading is required prior to beginning work.
(Attach copy of excavation contract for verification)
Amount Paid $ Date Paid 2_ / Zb / ((o
•:•City inspector must be notified 24 hours prior to beginning work related to this permit.
Printing your name indicates your acceptance of the terms and conditions of this form:
e a/z�/6,
Signature of Appli. ,nt/Contractor Rep. Date 1
Signature of City Engine-r Date
City Inspector for this project Contact Number(s)
Applicant shall indemnify and forever hold harmless against the City of Coppell each and
every claim, demand or cause of action that may be made or come against it by reason of or
if any way arising out of the closure,blocking, excavating, cutting, tunneling, or other work
by the applicant under permit from the City,if such permit is granted.
Submit by E-mail Print Form
Aro Weir P.O. Box 541793
Brothers Dallas, Texas 75354-1793
Contracting, LLC Phone: (972) 556-2000 Fax: (972) 556-2249
Description Quantity Unit Cost
Mobilization 1 Sum $ 500.00
Engineering/Layout 1 Sum $ 4,000.00
Clear&Grub 1 Sum $ 4,000.00
Strip&Stockpile Topsoil 2,044 CY $ 5,900.00
Mass Excavation 5,618 CY $ 44,700.00
Moisture Condition Pad 8'-6" Below Pad or Exist 36,420 CY $ 117,000.00
Crushed Concrete Cap @ Pad 18" 6,427 CY $ 173,000.00
Fine Grade Pad 108,500 SF $ 1,000.00
Cutback For Truck Docks 801 CY $ 13,000.00
Regrade Pay After Utilities 122,859 SF $ 4,300.00
Fine Grade Pay 122,859 SF $ 1,000.00
Respread Topsoil to Islands 470 CY $ 10,000.00
Sawcut/Remove Conc And/Or Curbs 1 Sum $ 2,400.00
Traffic Control 1 Sum $ 500.00
Excess Soil(if Any), hauled offsite $14/CY CY
Import Soil (if any),to site $14/CY CY
Total $381,300.00
ALTERNATES
1. 18"select fill cap in lieu of crushed concrete @ pad. Deduct:$20,000
2. Grind demo'd trees into mulch and stockpile mulch onsite. Add: $15,000
3. 100'x50' area of crushed concrete for jobsite trailer parking area (6" in
Add:$3,000
depth) plus a drive that's 100'x20'to access the parking area.
4.Conctstruction entrance,silt fence,and erosion control installations.
Excludes protect new inlets. Add: $12,000
5. Reduce moisture conditioned pad depth to 5' and reduce pad cap to
12" of crushed concrete. Deduct: $80,000
UNIT PRICES
Silt Fence with wire backing and steel posts. $2.20/LF
Furnish and install crushed concrete for temporary access. `13.50;TON
Project Tohatsu
670 South Freeport Parkway, Coppell,TX 75019
Duke Construction Limited Partnership(DCLP)
Superintendent-Glen Stevenson, Cell-865.755.6931, glen.stevenson@dukerealty.com
Project Manager-Sean Jeanes,Cell-214.674.0301,sean.ieanes@dukerealty.com
Weir Brothers Contracting, LLC
General Superintendent-Billy Truitt,Cell-214.681.5241, btruitt@weirbros.comm
Owner/Project Manager-Mike Weir,Cell-214.797.1551,mweir@weirbros.com