Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960311 (2)
G~O- CON~ULT'rNG ENG'rNEERS · ~r~Q~e ~nvi ror~entat Assessments ~, Soits & Foundations Construction MateriaLs Testing ,,ExceLLence by Experience" Commercial & lndustriat Inspection PO Box 92548 · SouthLake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 D&TE OF BREAK: 03-11-96 DAY: Monday CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE A~ED POUNDS PSI 72' drilled pier ~: 24A @ west abutment 6.5" 03-04-96 7 117,500 4156 24B @ west abutment 6.5" 03-04-96 7 116,000 4103 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Glenn Hutchinson Technician