Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960308
G~O- CON"'ILTING ENGINEERS IN: T~'J:QU~e avironmentat Assessments ~. Soits & Foundations Construction Mater~ats Testing "Excettence by Experience" Co~nmerc~at & Industriat Inspection PO Box 92548 · Southtake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-08-96 DAY: Friday CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI center bent: 17A @ Column D 4.0" 03-01-96 7 95,000 3360 17B @ Column D 4.0" 03-01-96 7 96,500 3414 72' drilled pier C: 18A @ west abutment 6.5" 03-01-96 7 91,500 3237 18B @ west abutment 6.5" 03-01-96 7 92,500 3272 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Glenn Hutchinson Technician