Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960308 (2)
G~O-- CONSULTING ENGINEERS IN: ~r~Q~, nvironmentat Assessments ~. SoiLs & Foundations Construction MateriaLs Testing .Exce[[ence byExperience" Coe~nercisL & Industrial Inspection PO Box 92548 * South[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-08-96 DAY: Friday CLIENT: Copper Stone Ltd CONTRACTOR: Glenn Thurman, Inc c/o Briscoe Clark Comp CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Auburn Way: 10A @ Station 1+00 3.0" 03-01-96 7 87,000 3077 10B @ Station 1+00 3.0" 03-01-96 7 86,000 3042 Martel Crt: llA @ Station 2+00 3.0" 03-01-96 7 85,500 3024 liB @ Station 2+00 3.0" 03-01-96 7 86,500 3060 12A @ Station 4+00 3.5" 03-01-96 7 88,500 3131 12B @ Station 4+00 3.5" 03-01-96 7 87,500 3095 Martel Ln: 13A @ Station 10+50 3.5" 03-01-96 7 86,000 3042 13B @ Station 10+50 3.5" 03-01-96 7 85,000 3007 14A @ Station 14+75 3.5" 03-01-96 7 87,000 3077 14B @ Station 14+75 3.5" 03-01-96 7 88,500 3131 15A @ Station 17+64 3.5" 03-01-96 7 84,500 2989 15B @ Station 17+64 3.5" 03-01-96 7 84,000 2971 Copperstone Trl: 16A @ Station 25+50 3.0" 03-01-96 7 86,000 3042 16B @ Station 25+50 3.0" 03-01-96 7 85,000 3007 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Glenn Thurman, Inc Glenn Hutchinson Technician