Loading...
Copperstone-LR 960307 G~ CONSULTING ENGINEERS IN= ~~Q~e -- ;,vironmentat Assessments ~. - Soits & Foundations Construction Hateria[s Testing ,'ExceLLence by Experience" Coe~ercia[ & Industrial Inspection PO Box 92548 * South[ake, Texas 7609Z * (817) 329-0281 CONCRETE CYLZNDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-07-96 DAY: Thursday CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTrACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI 72' drilled pier: 9A @ west abutment A 6.5" 02-29-96 7 98,500 3484 9B @ west abutment A 6.5" 02-29-96 7 98,000 3467 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Glenn Hutchinson Technician