Loading...
2014_0714 C�IECK ONE: IR.RIGATION DOMESTIC �� FIRELINE BACT�Z.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PwS: CITY OF COPPELL PWS I.D. # �, LOCATION OF SERVICE: �� (t- /��` `�- �� �s`:4 y' The bacl�low prevmtion assembly decailed below has beea tested and maintained as required by TNRCC regulanons and is certified to be operating withia acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Priaciple C Pressurc Vacu�Breaker _ _:___ � _ Double Check Yalve __- - - o Atmosphere Vacuum Breal:er . %y �� Maaufact�uer ��i� Siu Modei Number G�l_` '% i��1 l -� ���T Located At �;;�r ., `� �` ,. /��r'a`T, � ,. s«ial Ivumber �� c ;7 �// REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACULTM BREAKER Double Check Valve Assembly Qv2 lst Check y . � 2ad Checl: Z •Z Relief Valve Air Inlet Check Valve Ininal Test DGClosed Closed Ti�ht e' Opened at Opened at nsid Ti�t et Leal:ed ❑ �sid _osid '� RP•__psid �'`�f+ �` I,�;� o Did not Opea O Leal:ed � �P� and Materials -__ . _ Uszd- _. _ .. � - Test After DC-Closed Closed Tight o Optaed at Opeaed at _�sid Repair Tighi o �sid __..,osid RP sid The above is cerdfied to be true. ,/, , r�-,��n :5�k ,�; k ��� c�s�a T� �`fj� -��� ` Firm Name �r� � Firm Address i i►��c t'%r,�/ .��r ���"'�`��' Cert. Testa No. ��` �'-' ��'�'' Date �-=��'"`1 ��//��4 7� 7'z_?�t�' � Gauge # t '%ii� 2 � � llate last accuracy tested 7- `�- ��'�/� White- Customer's Copy Yellow - City Copy Pink-Tester's Copy