Loading...
Copperstone-LR 960301 ' G~'O- CONSULTING ENGTNEERS IN: ~J:~e wi ro~ntat Assess~nts ~ Soi ts & Fou~ations C~struction Materials Testing "~ce[[ence by ~rience" C~rcia[ & l~ustria[ lns~ction PO Box 925~8 · South[ake, ~exas 76092 · (817) ~29-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-01-96 DAY: Friday CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Bent #2: 3A @ 30" shaft D 6.0" 02-23-96 7 102,500 3626 3B @ 30" shaft D 6.0" 02-23-96 7 104,000 3679 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Jeff Holden Technician