Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960229
"¢~- CONSULTING ENGZNEERB T~QU~, . ~vironmentat Assessments ~. - Soils & Foundations Construction Hateria[s Testing "Exce{[ence by Experience" Commeccia[ & Industrial Inspection PO Box 92548 * South[eke, Texas 76092 * (817) 329-0281 CONCRETE CYLZI~DER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BR~AK: 02-29-96 DAY: Thursday CLIENT: copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp ~UB-CONT~ACTOR: Beck Foundations CYL. SLUM~~ DATE OF DAYS I.D. LOCATION (IN.) SAMPLE A~ED POUNDS PSI Bent #1: 2A @ 30" shafts B/C* 02-22-96 7 117,500 4156 2B @ 30" shafts B/C* 02-22-96 7 115,000 4068 * made by contractor SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Jeff Holden Technician