Loading...
2014_1105 C�IECK ONE: IR.RIGATION DOMESTIC FIRELINE � BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAN�OF PwS: CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE: 0�00 �DRTH P 01 N T The bacl�]ow preveation assembly decailod below has beea tested aad maiatained as required bv TNRCC re_¢uladons aad is certified to be operating withia acceptable paramtters. TYPE OF ASSEMBLY C� Reduced Pressure Principle � Pressure Vacu�Breaker �� Double Check Valve o Amiosphere Vacuum Breal:er Maaufactsaer I'�L3 C d Siu 8 �� Model Number �S 6 Located At �N VA U L T- ,Y D R?N 1.�1�ST p F Scrial Ni�ber � 45a81 "�06 � 8 � � d9 q� fhe STRE�7. REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAI�R Doubie Check Valv�Assembly lst Check �nd Checi: Relief Valve Air Inlet Check Valve Ininal Test DC-Closed ��b Closed Ti,Qht � Opened at Opened at osid Ti�i ❑ Leal:ed ❑ Dsid __osid RP-_psid a, � �� ❑ Did not Open o Leal;ed � �P� aad Mataials Usod Test ARet DC•Closcd Closed Tight o ppencd at Opea�at _�sid Repair Tight ❑ nsid __osid RP sid The above is certified to be true. Fi�m Name i�o E t T E R I�l 1?E PR o T , Cerifiod Tesca �A R`I G I o u�R Firm Address I D 3 5 ( p L Y P''1 P.I C P R Cnt Tester No? �I) 5 7 a Date I^ ' I Gauge # B y 11 / 9 5� llate last accuracy tested b'3� �e/ White- Customer's Copy Yellow - City Copy Pink-Tester's Copy C�iECK ONE: IRRIGATION DOMESTIC FIftELINE � BACI�LOW PREYENTION ASSEMBLY TES'T AND MAINTENANCE REPORT rr.�OF Pws: CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE: �CJ C /�f o i�r N P o r nl T E The bacl�low prevmtion assembly detailed below has beea tested aad maintained as required by TNRCC regulauons and is cudfied to be operating withia acceptable paramcters. TYPE OF ASSEMBLY e/ Reduced Pressure Principle ❑ Pressurc Vacuimm Breaker 5' Double Chxk Valve o Atmosphere Vacuum Breal:er Maaufactsaer ,�e L3 _O Siu 3 f� �1 ,�,� 1�a u c.T - N, I�l, n� Model Number g�)� y � Located At �'d G# �T R E�r scrial N�ber �s Ru sr�D (7uT � REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAI�R Double Check Valv�Assembly lst Check ?nd C3ecl: Relief Valve Air Inlet Check Va1ve Inidal Test D -Closed a� I Closed Ti;ht Opcaed at Opeaed at osid TiQht ❑ Leal:ed ❑ _�vsid osid R.P-_psid �;� ❑ � > �C Did not Opea o I,eal�ed � �P� and Materials Used Test After DC-Closed Closed Tight o Opeaed at Opmed at _�sid Repair Tight o �sid _nsid RP sid The above is cerafied to be true. '/ � / Firm Name l�0�%l ER 1�-L l�E Cerdfied Teste �R y �y l D v�/Z L3f' Firm pddress l b 3 5 I UL!� � C p R Cert. Tester No. DO I I 5 7 a Date "l I 5- �y ����As x 7 sa a� Gauge # 1�y 1119 5(� llate last accuracy tested �p ' 3 �1 � White- Customer's Copy Yellow - City Copy Pink-Tester's Copy