Loading...
MA 10-07-CS140707 Michelle Matunas From:Shannon Gray <sgray@dart.org> Sent:Monday, July 07, 2014 4:27 PM To:Adrian Bowman Cc:Frances Wilson; George Marshall Subject:Re: MacArthur Blvd. in Coppell MP 606.2 Hi Adrian. It would be best to wait for the final or approved document before we proceed. I understand that the City has the desire to start next Monday, but realistically, that may not occur due to the fact that we have to (1) route the document for both DART and Bowman's signature and (2) obtain approval of insurance from DART Risk Management. Securing the Contractor Right of Entry should have been factored into the initial planning phase of the project before Council's approval. Nevertheless, we'll do our best to expedite the process as much as possible. Thanks, Shannon On Mon, Jul 7, 2014 at 3:50 PM, Adrian Bowman <adrian@bowmanconstruction.com> wrote: Thanks for the response Shannon. Would it be possible to go ahead and execute the current ROE Agreement and then submit additional insurance once the revised agreement is ready? This project must start next Monday. 7/14, and should be completed before the end of the month. It’s a very aggressive schedule so we can get traffic flowing as soon as possible. Obviously, it also very political with the City of Coppell. Any help is appreciated. Thanks, Adrian From: Shannon Gray \[mailto:sgray@dart.org\] Sent: Monday, July 7, 2014 3:03 PM To: Adrian Bowman Cc: Frances Wilson Subject: Re: MacArthur Blvd. in Coppell MP 606.2 Hi Adrian. Our Contractor Right of Entry is being revised. I will be sure to provide you the latest version when available. 1 Thanks, Shannon Gray Right of Way Representative 214.749.2794 On Mon, Jul 7, 2014 at 11:03 AM, Adrian Bowman <adrian@bowmanconstruction.com> wrote: th Are there any updates on the new Right of Entry Agreement? I am scheduled to start work next Monday, the 14. This date is set in stone with their City council, fire, and police departments and cannot be rescheduled. Any help you can provide to expedite the process is much appreciated. Thanks, Adrian From: Frances Wilson \[mailto:fwilson@dart.org\] Sent: Monday, June 30, 2014 2:45 PM To: Shannon Gray Cc: adrian@bowmanconstruction.com Subject: MacArthur Blvd. in Coppell MP 606.2 Shannon, I've worked with Bowman Construction in the past so I know their insurance will be approved. The work is scheduled to begin July 14th. Please contact Adrian Bowman and provide contact information for working within the Cotton Belt ROW in Coppell where Ft. Worth & Western operates. I told Adrian that Bowman's workers will need RWP classes and a flagman will be required. 2 As I understand, Bowman Construction will be working on the roadway, but not as it crosses the Cotton Belt, but south of it, though within the southern ROW. Adrian, please correct me if I'm incorrect. Finally, our Contractor Right of Entry (CROE) is being revised for insurance, so it will be a few days before Shannon can get a CROE to you. Thanks! Frances Wilson, SR/WA, R/W-NAC Sr. Right of Way Representative Commuter Rail & Railroad Management Dallas Area Rapid Transit P.O. Box 660163 Dallas, TX 75266-7210 Direct Phone: 214.749.3619 Fax: 214.749.3609 fwilson@dart.org Righ t- click here to dow nlo W -- Shannon D. Gray Right of Way Representative 3 Commuter Rail & Railroad Management Dallas Area Rapid Transit Mailing: P. O. Box 660163 Dallas, Texas 75266-7210 214.749.2794 (O) sgray@dart.org -- Shannon D. Gray Right of Way Representative Commuter Rail & Railroad Management Dallas Area Rapid Transit Mailing: P. O. Box 660163 Dallas, Texas 75266-7210 214.749.2794 (O) sgray@dart.org 4