Loading...
Explorer Pipeline-CS 880301 March 1, 1988 Mr. Steven M. Morton Chief of Land Development City of Coppell P. O. Box 478 Coppell, Texas 75019 RE: CORROSION CONTROL DATA, 12-INCH EXPLORER PI Dear Mr. Morton: Explorer's 12-inch pipeline in the area of the re-route of the pipeline for the U. S. Post Office and Royal Lane has cathodic protection applied from an impressed current cathodic protection rectifier. The rectifier is located approximately 5.3 pipeline miles east of the re-route location. The specified rectifier is located at Explorer's Carrollton, Texas junction and is applying 2.1 amps of cathodic protection current to the 12-inch pipeline within which the re-route is located. For cathodic protection application and isolation, this specific 12-inch pipeline is 11.6 miles in length (5.3 pipeline miles east; 6.3 pipeline miles west of the re-route). The cath- odic protection potential at the re-route area is maintained at an approximate cathodic protection pipe-to-soil potential of -1.30 volts. There is 0.32 amps of cathodic protection current passing this location from the 6.3 miles of 12-inch pipeline to the west, returning to the source of cathodic protection, the impressed cur- rent rectifier at Explorer's Carrollton, Texas Junction. Cathodic protection being applied to Explorer's pipelines meets or exceeds the requirements of the Federal Department of Transpor- tation, Office of Pipeline Safety Part 195. The cathodic protection applied to Explorer's 12-inch pipeline should not cause corrosion interference to existing City of Coppell buried fuel tank, nor should the tank cause the Explorer 12-inch pipeline any problems. Explorer has or will install suf- ficient cathodic protection testing facilities to confirm the sta- tus of its pipeline. The city of Coppell needs testing facilities installed on their fuel tank for corrosion control testing. Mr. Steven M. Morton -2- March 1, 1988 Testing facilities on both structures will allow monitoring and testing following completion of construction; on an annual basis during routine testing by Explorer; and at any other time as may be necessary, should changes be made to either structure. Should you have additional questions or concerns, please do not hesitate to call. Yours truly, Samuel L. Irwin Chief Corrosion Engineer SLI/tf copy to: J. B. Benear C. A. Hilgendorf File 25.212.0