Loading...
ST0301C- LR160209i GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 Report Date: February 9, 2016 Date Concrete Placed: Client: City of Coppell Project: Bethel & Coppell Road Contractor: Axis Contracting, Inc. Concrete Supplier and Plant: TXI Operation, LP 141 Location of Placement: S. Coppell Rd., E. Side Sidewalk January 12, 2016 Standard6"xl2" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 59 Project No.: 215-140 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 8272 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: 'rime Completed: Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): 10:16 AM 10:47 AM Sidewalk at 20'N. of Approach to 556 01/3136193 51 OF 54 OF 3.25 Clear 8:30 AM 5:00 PM 3.25 10.0 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 270 7 1/19/16 105,600 3,740 BCR 271 28 2/9/16 114,840 4,060 3.25 BCR 272 28 2/9/16 123,440 4,370 BCR 273 H H I I Test Methods Utilized Fracture Regular [(Unless Cylinders Made By: RB ASTM C-31, C-39, C-143 Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a),coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasQ) coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(i4coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email- rcaudill(i�tiseopaving.com Inc. All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 Fax (214) 352-6972 1 11 Report Date: February 9, 2016 Date Concrete Placed: January 12, 2016 Standard 6"x12" Cylinders Client: City Of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 60 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: Parking Space at E. Side of S. Coppell Rd. and Intersection of McNear Dr MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 Time Sample Batched: Cement: Time Sampled: Fly Ash: Sample Location: Coarse Aggregate: Truck / Ticket No: Intermediate Aggregate: Temperature Fine Aggregate: Ambient Range: Admixtures: Concrete Range: BCR 275 Slump Range (inches): l Weather Conditions: 2 Time Started: Time Completed: Added Water: 0 Sample Air Content (%): Total Cubic Yards Placed: Rennirerl Strenuth fT.hc /en in 1 1:28 PM 2:35 PM Parking Space at E. Side, 50'N. of Bethel Rd. */28536 64 OF 70 OF 2.75 Clear 8:30 AM 5:00 PM 3.75 8.0 1 Ann Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 274 7 1/19/16 151,300 5,350 BCR 275 28 2/9/16 162,120+ 5,730+ 2.75 BCR 276 28 2/9/16 165,000+ 5,840+ BCR 277 H H Test Methods Utilized Fracture Regular Cylinders Made By: RB ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell cr,coppelltx.aov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(acoppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall cr copyelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(iitiseopaving.com TBPE Firm: F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. -INICAL ENGINEERING VIRONMENTAL CONSULTING # CONSTRUCTION MATERIALS TESTING GEE Consultants, inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 Report Date: February 10, 2016 Date Concrete Placed: February 2, 2016 Standard 6"xI2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 65 Contractor: Iron Concrete Construction Project No.: 215-140 Concrete Supplier and Plant: Argos #110 Location of Placement: Inlet at Bethel Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: DI000I083PPU Time Sample Batched: 11:45 AM Cement: Time Sampled: 12:25 PM Remarks Sample Location: Inlet at Station 28+96.54, at SE. Fly Ash: 2/9/16 Comer of Bethel and Hearthstone Coarse Aggregate: *Concrete truck arrived I hr late Ln. Intermediate Aggregate: Truck / Ticket No: 0/1771010 Fine Aggregate: Temperature: OF BCR 296 Ambient Range: 64 Admixtures: Concrete Range: 70 OF I Slump Range (inches): 5.5 Weather Conditions: Clear 2 Time Started: 10:00 AM Added Water: 0 Gat Time Completed: 2:00 PM Sample Air Content 3.2 BCR 298 Total Cubic Yards Placed: 8.0 H Re uired Strength (Lbs./sq.in.): 4,200 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) — Remarks BCR 295 7 2/9/16 98,040 3,470 *Concrete truck arrived I hr late than scheduled time BCR 296 28 3/1/16 5.5 BCR 297 28 3/1/16 BCR 298 H H I Test Methods Utilized J Fracture Regular Cylinders Made By: YS I ASTM C-31, C-39, C-143 1 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City Of Coppell via E-mail: Rodell(ibcoppellIx-gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasAconvellIx.gov Mr. George Marshall - City of Coppell via Email: gmarshallk)coppelltx-go Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a-)tiseoi)aving.com GEE Consultants, Inc. TBPE Firm: F-3212 — Reviewed b : All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.