Loading...
ST0301C-LR160211G1 • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: February 11, 2016 City of Coppell Bethel & Coppell Road Axis Contracting, Inc. TXI Operation, LP 141 Stamped Concrete Paving, Date Concrete Placed: January 14, 2016 Standard 6"xl2" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 61 Project No.: 215-140 W. Bound, McNear Dr., 30' E. of S. Coppell Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 8274 Cement: 6 Sack Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): 10:00 AM 10:40 AM McNear Dr., 30'E of S. Coppell Rd. 01/3140699 60 OF 66 OF 4.75 Clear 9:30 AM 1:30 PM 3.4 26.0 5,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 278 4 1/18/16 106,600 3,770 BCR 279 7 1/21/16 141,500 5,010 BCR 280 4.75 28 2/11/16 161,580+ 5,720+ BCR 281 28 2/11/16 161,640+ 5,720+ BCR 282 H H Test Methods Utilized Fracture Regular Cylinders Made By: HP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a.coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasa co pelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshallncoppelltx gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill a tiseopavina.com No Inc. TBPE Firm All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. -INICAL ENGINEERING IVIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultanis, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 « Fax (214) 352-6972 Report Date: February 11, 2016 Date Concrete Placed: January 14, 2016 Standard 6"x12 Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road. Concrete Report No.: 62 Contractor: Axis Contracting, Inc. Project No.: 215-140 Concrete Supplier and Plant: TXI Operation, LP 141 Location of Placement: Sidewalk, N. Bound, S. Coppell Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 8274 Time Sample Batched: 10:34 AM Cement: 6 Sack 'Time Sampled: 11:15 AM Fly Ash: Sample Location: 'Truck Sidewalk 15'N. of McNear Dr. 7 / Ticket No: 01/3140845 Coarse Aggregate: Temperature: BCR 284 Intermediate Aggregate: Ambient Range: 61 OF Fine Aggregate: Concrete Range: 65 OF Slump Range (inches): 6.75 Admixtures: Weather Conditions: Clear 1 Time Started: 9:30 AM 2 Time Completed: 1:30 PM 5,480 Sample Air Content (%): 3.2 Added Water: Total Cubic Yards Placed: 30.0 Require Stren h (Lbs./s .in.): 3,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 283 7 1/21/16 128,860 4,560 BCR 284 28 2/11/16 149,240 5,280 6.75 BCR 285 28 2/11/16 155,060 5,480 BCR 286 H H Test Methods Utilized Fracture Regular Cylinders Made By: HP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(ct�,coppelltx.gov Mr. Michelle Matures - City of Coppell via Email: mmatunas(a),coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(a7coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(n7�tiseopaving.com Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.