Loading...
Fellowship-LR 990727CONCRETE COMPRE ,SIVE STRENGTH TES' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 06/24/1999 Report No.: 9917300 07/27/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: N/A PLACEMENT DATE: 06/24/1999 BATCH TIME: N/A PLANT: N/A TIME SAMPLED: N/A BY: Contractor Made SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENaTI-I: 3000 psi @ 28 Days TEMPERnTtq~ (F)- AIR N/A F CONCRETE: N/A V SLVMP: 5.0" Max TRUCK NO: N/A TICI~T NO: N/A AIR: 3-6% Am coNTeNT (%): N/A UNIT WEIGHT (pcf): N/A TEST METaOD: ASTM C-143 PLACEMENT LOCATION: Sidewalk ASTM C-172 ASTM C-39 SAMPLE LOCATION: East side of daycarc REPORT OF TESTS ACCUMULATIVE YARDS: N/A CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 N/A 07/01 / 1999 7 102350 3620 ! 2 N/A 07/01 / 1999 7 96680 3420 Average 3520 1 3 N/A 07/22/! 999 28 120110 4250 1 4 N/A 07/22/1999 28 122010 4310 Average 4280 Technician: ErvinFarris Started: 10:30am Finished: 12:30pm ~ eering, Inc. Report Distribution: ~..~.~n (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 1