Loading...
Hammond- LR150527 Rone Engineering 8908 Ambassador Row,Dallas, 75247 Texas Engineering Firm Registration,No. F-1572 Corporate Phone:(214)630-9745 111111111111011.1 Report of Moisture Density Relationship Client: JRose Architects Report No.: 14127134 230 Lake Drive Project No.: 1519926 Mount Vernon, TX 75457 Date of Service: 05/15/2015 Report Date: 05/27/2015 Project: Hammond Street Residential Development Coppell, Texas Services: Obtain a sample of material from the jobsite,bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA Contractor: Date Sampled: 05/15/2015 Test For: Select Fill Material Preparation: Moist Material: Reddish Brown Silty, Clayey Sand Rammer Type: Mechanical Classification:Select Fill Sampled By: Neal, Korey Test Method: ASTM D4318 Method-B Sample Location: ASTM D698 Method-B Stockpile ASTM D1140 REPORT OF TEST Maximum Dry Density, pcf: 117.5 pcf Optimum Moisture Content, %: 12.0% 125 100%saturation line for SG=2.65 Estimated Liquid Limit: 20 120-- Plastic Limit: 16 - Plasticity Index: 4 % Passing #200: 25 115 0 110- 105 14-105 T 3 9 10 11 12 13 14 15 16 Moisture Content,percent Technician: Korey Neal Started: 07:30am Finished: 09:OOam Rone Engineering Report Distribution: Orig:JRose Architects(Mount Vernon,TX)Attn:Ms.Barb Rose it •171 (1-ec copy) 1-ec Rone Engineering Project Managers Attn:Mr.Josh Oliver 1-ec JRose Architects Attn:Mr.Jason Rose Josh Oliver,EIT Project Manager LIMITATIONS:The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition,appearance,etc.)or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services,Ltd. (KANO) Page 1 of 1