Fellowship-LR 990727 (2)CONCRETE COMPREoSIVE STRENGTH TES
ENGINFI__RI~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
RePort Date
Date of Service: 06/25/1999 Report No.: 9917450
07/27/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road Coppell, Texas
Dallas TX 75235
Services: Submitted Cylinders. Ail information other than that related to compressive strength is submitted and
assumed to be correct.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 06/24/1999 BATCH TIME: N/A
PLANT: N/A TIME SAMPLED: N/g BY: Contractor Made
SPECIFICATION REQUIREMENTS WEATHER CONVrrIoNS: N/A
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F). AIR N/A F CONCRETE: N/A V
SLUMP: N/A TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): N/A uNrr WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Sidewalk on east side of church
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCVMULATn'E YARDS: N/A
CYLINDER MEASURE.D MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 N/A 07/01/1999 7 111110 3930
1 2 N/A 07/01/1999 7 111090 3930
Average 3930
1 3 N/A 07/22/1999 28 156760 5540
1 4 N/A 07/22/1999 28 159660 5650
Average 5600
Technician: Greg Dimock Started: N/A Finished: N/A ~1-~ ~ Engineering, Inc.
Report Distribution:
(I) Julian P. Barry General Contractors
(1) Urban Architecture Eugene Harbour
(1) City of Grapevine Vice President
(1) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1