Loading...
Fellowship-LR 990727 (2)CONCRETE COMPREoSIVE STRENGTH TES ENGINFI__RI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 RePort Date Date of Service: 06/25/1999 Report No.: 9917450 07/27/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Submitted Cylinders. Ail information other than that related to compressive strength is submitted and assumed to be correct. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 06/24/1999 BATCH TIME: N/A PLANT: N/A TIME SAMPLED: N/g BY: Contractor Made SPECIFICATION REQUIREMENTS WEATHER CONVrrIoNS: N/A STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F). AIR N/A F CONCRETE: N/A V SLUMP: N/A TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A uNrr WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Sidewalk on east side of church ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCVMULATn'E YARDS: N/A CYLINDER MEASURE.D MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 N/A 07/01/1999 7 111110 3930 1 2 N/A 07/01/1999 7 111090 3930 Average 3930 1 3 N/A 07/22/1999 28 156760 5540 1 4 N/A 07/22/1999 28 159660 5650 Average 5600 Technician: Greg Dimock Started: N/A Finished: N/A ~1-~ ~ Engineering, Inc. Report Distribution: (I) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1