Loading...
Fellowship-LR 990706CONCRETE COMPRE ,$IVE STRENGTH TES- 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/25/1999 Report No.: 9917450 Report Date 07/06/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Submitted Cylinders. All information other than that related to compressive strength is submitted and assumed to be correct. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 06/24/1999 BATCH TaYto: N/A PLANT: N/A TIME SAMPLED: N/A BY: Contractor Made SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: N/A STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR N/A P CONCRETE: N/A g SLUMP: N/A TRUCKSO: N/A TICKET NO: N/A AIR: N/A Am CONTENT (%): N/A ~-Nrr WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Sidewalk on east side of church ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YAgOS: N/A CmNDER M ASURED MAXIMUM coMPREssiw MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 N/A 07/01/1999 7 111110 3930 1 2 N/A 07/01/1999 7 111090 3930 Average 3930 1 3 N/A 07/22/1999 28 1 4 N/A 07/22/1999 28 Technician: Greg Dimock Started: N/A Finished: N/A ~ E~ngjneerlng, Inc. Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of I