Loading...
Fellowship-LR 990706 (2)CONCRETE COMPRE 3IVE STRENGTH TES. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 06/24/1999 Report No.: 9917300 07/06/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: N/A PLACEMENT DATE: 06/24/1999 RATC}I TIM~: N/A PLANT: N/A TIYm SAMPLED: N/A aY: Contractor Made SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear S~aF~NOTrI: 3000 psi @ 28 Days TEMrERA~JRE (F)- AIR N/A v CONCm~TE: N/A r SLUMP: 5.0" Max TRUCK NO: N/A TICKET NO: N/A Am: 3-6% Am COnteNT (%): N/A VmT WEIGHT (pct'): N/A PLACEMENT LOCATION: T~ST METHOD: ASTM C- 143 siacwalk ASTM C-172 ASTM C-39 SAMPLE LOCATION: East side of daycare REPORT OF TESTS ACCUmJLA~ VA~S: N/^ CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (p~i) TYPE ! 1 N/A 07/01/1999 7 102350 3620 1 2 N/A 07/01/1999 7 96680 3420 Average 3520 1 3 N/A 07/22/1999 28 1 4 N/A 07/22/1999 28 Technician: Ervin Fan'is Started: 10:30am Finished: 12:30pm I-'l~_ Engineering, Inc. Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 1