Fellowship-LR 990525 (2)CONCRETE COMPRi_.3SIVE STRENGTH TES £
ENGINEERING, INC.
$901 Carpenter Frwy., Suite #100
Dallas~ Texas 75247
Date of Service: 04/21/1999 Report No.: 9911291 Report Date
05/25/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A
CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 04/21/1999 BATCH TIME: 3:45pm
PLANT: Batch Truck TIME SAMPLED: 3:50pm ~¥: Greg Dimock
SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 74 ~ CONCRETE: 73 F
SLUMP: 5.0" Max TRUCKNO: 462 TICKET NO: 169772
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Inlet curbs and slopes, inlet at north side of strip #44 & at middle island in strip 41
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Inlet @ N side of strip #44
REPORT OF TESTS ACCUMULATIVE YARDS: 8
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.00 04/28/1999 7 102780 3630
1 2 5.00 04/28/1999 7 106420 3760
Average 3700
1 3 5.00 05/19/1999 28 153920 5440
1 4 5.00 05/19/1999 28 148700 5260
Average 5350
Technician time: See Report #9911238
Sampled from truck.
Technician: Greg Dimock Started: Finished: I"'l-J~'~-h'~neering,
Inc.
Report Distribution:
(1) Julian P. Barry General Contractors
(1) Urban Architecture ~ Eugene Harbour
(1) City of Grapevine Q Vice President
( I ) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1