Loading...
Fellowship-LR 990525 (2)CONCRETE COMPRi_.3SIVE STRENGTH TES £ ENGINEERING, INC. $901 Carpenter Frwy., Suite #100 Dallas~ Texas 75247 Date of Service: 04/21/1999 Report No.: 9911291 Report Date 05/25/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 04/21/1999 BATCH TIME: 3:45pm PLANT: Batch Truck TIME SAMPLED: 3:50pm ~¥: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 74 ~ CONCRETE: 73 F SLUMP: 5.0" Max TRUCKNO: 462 TICKET NO: 169772 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Inlet curbs and slopes, inlet at north side of strip #44 & at middle island in strip 41 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Inlet @ N side of strip #44 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 04/28/1999 7 102780 3630 1 2 5.00 04/28/1999 7 106420 3760 Average 3700 1 3 5.00 05/19/1999 28 153920 5440 1 4 5.00 05/19/1999 28 148700 5260 Average 5350 Technician time: See Report #9911238 Sampled from truck. Technician: Greg Dimock Started: Finished: I"'l-J~'~-h'~neering, Inc. Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture ~ Eugene Harbour (1) City of Grapevine Q Vice President ( I ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1