Loading...
Fellowship-LR 990429'CONCRETE COMPR- SSIVE STRENGTH TEa I' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/21/1999 Report No.: 9911238 Report Date 04/29/1999 Client No.: 47677000 Project No.: 94991026 ( Clieg~ulian P. Barry General Contractors Project: Fellowship of Las Colinas ~ ~A~tt.n: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCm~TE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/21/1999 BATCH TrME: 11:15am PLANT: On-Site TIME SAMPLED: I l:20am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Clear and windy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 73 F CONCRETE: 75 F SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 5.75 UNIT WEIGHT (pct): 147.3 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving- Fire lane southeast comer of strips 17, from strip 33 to 54, approach from strip 55 ASTM C-172 to north 54 ASTM C-39 (continued in comments) SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.00 04/24/1999 3 66260 2340 1 2 5.00 04/28/1999 7 87330 3090 1 3 5.00 04/28/1999 7 93990 3320 Average 3210 1 4 5.00 05/19/1999 28 I 5 5.00 05/19/1999 28 Placement location continued: Drive thru strip #48/37, east end/#18/36 east end/#16/32 east end. Middle island in strip #48 and light pole piers, piers 1-16. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILl. Page 1 of 3 Report No.: 9911238 Sample location: Southeast corner fire lane, 10' north of south curb and 20' west of east. Note: Sampled at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LI~ Page 2 of 3 · CONCRETE COMPR._,$SIVE STRENGTH TE , l' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/21/1999 Report No.: 9911238 Report Date 04/29/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DAT~: 04/21/1999 I}ATCH T~ME: 2:40pm PLANT: On-Site TIME SAMPLED: 2:45pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 74 F CONCRETE: 80 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.5 UNIT WEIGHT (per): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 Sampled at truck. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 4.50 04/24/1999 3 68500 2420 2 2 4.50 04/28/1999 7 91590 3240 2 3 4.50 04/28/1999 7 96570 3410 Average 3330 2 4 4.50 05/19/1999 28 2 5 4.50 05/19/1999 28 Sample location: 10' East of strip #54 east joint and 5' north of south curb in southeast corner firelane Technician: Greg Dimock Started: 7:00am Finished: 5:30pm I'"BC Enginee~~nc. Report Distribution: (1) Julian P. Barry General Contractors ( 1 ) Urban Architecture Eugene H-arbour (1) City of Grapevine Vice President (l) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011.L Page 3 of 3