Fellowship-LR 990511 A IBC
IN-PLACE DENSITY 2STING
ENGINFY_RII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/20/1999 Report No.: 9911178 Report Date
05/11/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services:
PROJECT DATA
CONTRACTOR: Julian P. Barry Laboratory Test Method: ASTM D-698
Field Test Method: ASTM D-2922
ASTM D~3017
MOISTURE DENSITY RELATIONS:
Maximum Project Requiremeuts
l~Ul) No. Description Moisture % Density pcf Moisture Density
1 Dk bm silty cl (lime treated) 29.5 87.0 -1/+3% 95%
FIELD DENSITY TESTS
TEST MJD MOISTURE DRY DENSITY DENSITY
NO TEST LOCATION No. (%) (pcf) (% max)
Paving, Subgrade
86 Final Lift, Grid 585N/790W I 29.5 85.9 99
Test results on this report meet project specification.
Technician: Roy Montgomery ~ En~g, Inc.
Report Distril)ution:
(l) Julian P. Barry General Contractors
( 1 ) Urban Architecture Eu~'ene Harbour
( 1 ) City of Grapevine Vice President
(1) City of Coppell
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07TMI' Page I of 1