Loading...
Fellowship-LR 990525 (4)-CONCRETE COMPRL ._,SIVE STRENGTH TE ' ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/20/1999 Report No.: 9911132 05/25/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUI'I'I,IER: LH Lacy PLACEMENT DATE: 04/20/1999 BATCh TIME: 10:25am I'I.ANT: On-site 'rIME SAMPLED: 10:30am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIlER CONDITIONS: Clear STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 75 V CONCRETE: 76 F SLUMI': 1-3" TRUCKNO: N/A TICKETNO: N/A ,,,ia: 4-6% AIR CONTENT (%): 5.5 UNrr WEIGItT (pcf): 147.7 TEST METIIOI): ASTM C-143 PLACEMENT LOCATION: Paving~ Leaveouts & tie-ins TI on south side of strip #28. entire length x 15' & TI northsidc ASTM C-172 or slrip 9 entire length x 151 TI north of strip #42. west half from island to wesl end x lY. ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCU WLATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 4.50 04/23/1999 3 75850 2680 1 2 4.50 04/27/1999 7 87600 3100 1 3 4.50 04/27/1999 7 86970 3080 Average 3090 I 4 4.50 05/18/1999 28 106800 3780 I 5 4.50 05/18/1999 28 112510 3980 Average 3880 Placement location: Drive ~hru at eas~ end of s~rips #29/42. Tie in at west end of strip #54 to existing parking lot at fire lane. This report is exclusively for the use of the client indicated atx)ve and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 3 · Report No.: 9911132 Sample location: 25' West of northeast corner of strip ~9 and 4' north of strip #9. Sampled from truck. This reporl is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 3 L"[,S '" CONCRETE COMPR IVE STRENGTH TEL f ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/1999 Report No.: 9911132 Report Date 05/25/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. BmTy CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/20/1999 WATCH 'rimE: 2: 25pm PLANT: On-site TIME SAMPLEI): 2:30pm BY: Grog Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTh: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 82 F SLUMP: 1-3" IRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.25 UNIT WEIGHT (pcf): N/A TEST METIIOI): ASTM C- 143 PLACEMENT I.OCAT1ON: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 4.00 04/23/1999 3 73520 2600 2 2 4.00 04/27/1999 7 89100 3150 2 3 4.00 04/27/1999 7 86690 3070 Average 3110 2 4 4.00 05/18/1999 28 110940 3920 2 5 4.00 05/18/1999 28 113080 4000 Average 3960 Sample location: Tie in at southwest corner fire lane, 20' west strip #54 joint and 10' north of south curb. Technician: Grog Dimock Started: 6:00am Finished: 5:00pm Lng c. Report Distribution: (1) Julian P. Barry General Contractors ( 1 ) Urban Architecture Eugene I4~rbour (1) City of Grapevine Vice President ( I ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriuen approval of HBC Engineering, Inc. 0ILL Page 3 of 3