Loading...
Fellowship-LR 990428CONCRETE COMPRL SIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/1999 Report No.: 9911132 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/20/1999 BATCHTIME: 10:25am PLANT: On-site TIME SAMPLED: 10:30am ~Y: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER cor, mrrioNs: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)-AIR 75 g CONCRETE: 76 g SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.5 UNIT WEIGHT (pcf): 147.7 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving- Leaveouts & tie-ins TI on south side of strip #28, entire length x 15' & TI northside msrm C- 172 of strip 9 entire length x 15'. TI north of strip #42, west half from island to west end x 15'. ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 4.50 04/23/1999 3 75850 2680 I 2 4.50 04/27/1999 7 87600 3100 I 3 4.50 04/27/1999 7 86970 3080 Average 3090 I 4 4.50 05/18/1999 28 I 5 4.50 05/18/1999 28 Placement location: Drive thru at east end of strips ~29/42. Tie in at west end of strip #54 to existing parking lot a5 fire lane. This report is exclusively fi~r the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011,I~ Page I of 3 ,Report No.: 9911132 Sample location: 25' West of northeast corner of strip #9 and 4' north of strip #9. Sampled from truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0 ! I.L l'age 2 ol' 3 CONCRETE COMPRL JSIVE STRENGTH TES I'"BC ENGINEF_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/20/1999 Report No.: 9911132 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/20/1999 BATCH TIME: 2:25pm PLANT: On-site TIME SAMPLED: 2:30pm ~Y: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 86 F CONCRETE: 82 F SLUMP: !-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.25 UNIT WEIGHT (pcf): N/A TEST METItOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 4.00 04/23/1999 3 73520 2600 2 2 4.00 04/27/1999 7 89100 3150 2 3 4.00 04/27/1999 7 $6690 3070 Average 3110 2 4 4.00 05/18/1999 28 2 5 4.00 05/18/1999 28 Sample location: Tie in at southwest corner fire lane, 20' west strip #54 joint and 10' north of south curb. Technician: Greg Dimock Started: 6:00am Finished: 5:00pm ~ En~ring Report l)istrihution: ~ Inc. (I) Julian P, Barry General Contractors ( 1 ) Urban Archilcclurc Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the usc of the client indicated above aud shall not be reproduced except in full without the written approval of HBC Engineering, lnc. 01LI, Page 3 of 3