Loading...
Fellowship-LR 990525 (5)CONCRETE COMPRI_ 5SIVE STRENGTH TEL f ENGINEERII'~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/19/1999 Report No.: 9910982 Report Date 05/25/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/19/1999 BATCII TIME: 9:50am PLANT: On-site TIME SAMPLED: 9:55am ~v: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (g)- AIR 66 F CONCRETE: 69 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.75 UNIT WEIGtlT (pet): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Paving- Small parking strip west of strip #51, approach from strip 49 to 51, islands at west ASTM C- 172 end of 43, 14/34, 15/35. 19/38. (continued below) ASTM C-39 SAMPLE LOCATION: At island, west end of strip 38 REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.25 04/22/1999 3 82040 2900 ! 2 4.25 04/26/1999 7 69980 2470 1 3 4.25 04/26/1999 7 69870 2470 Average 2470 I 4 4.25 05/17/1999 28 116680 4130 1 5 4.25 05/17/1999 28 124380 4400 Average 4270 Placement location continued: Islands at east end of strips 43, 14/34, 15/35, 19/38. Approach from strip 48 & 49 to middle fire lane south. Approach from strip This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 3 · ReportNo.: 9910982 48 & 49 to fire lane north (middle fire lane) islands at west ends of strips 44/13, 13/33, 16/36, 18/37. Sampled at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 01I,L Page 2 of 3 CONCRETE COMPRL-' SIVE STRENGTH TEL" ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/19/1999 Report No.: 9910982 Report Date 05/25/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke 6616 Forest Park Road Phase III - Expansion Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/19/1999 aATCn TIME: 2:25pm PLANT: On-site TIME SAMPLED: 2:30pm ~Y: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 86 V CONCRETE: 89 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGIIT (pct'): N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 4.50 04/22/1999 3 62040 2190 2 2 4.50 04/26/1999 7 94490 3340 2 3 4.50 04/26/1999 7 91140 3220 Average 3280 2 4 4.50 05/17/1999 28 101010 3570 2 5 4.50 05/17/1999 28 104620 3700 Average 3640 Sample location: At curb base in island at west end of strip 16. Sampled at truck. Technician: Oreg Dimock Started: 6:00am Finished: 5:00pm Report Distribution: Engi . ( 1 ) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3