Loading...
Fellowship-LR 990426CONCRETE COMPRE ,SIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/16/1999 Report No.: 9910793 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/16/1999 BATCH TIME: 8:25am PLANT: On-site TIME SAMPLED: 8:30am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 47 F CONCRETE: 61 F SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.0 UNIT WEIGHT (pcf): 148.9 TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Paving-Strips 48, 47, 42, 41, east fire lane from entry road at cul-de-sac to strip 54 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 75' W of E form in strip 48 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 4.00 04/19/1999 3 66140 2340 1 2 4.00 04/23/1999 7 96210 3400 1 3 4.00 04/23/1999 7 92160 3260 Average 3330 I 4 4.00 05/14/1999 28 1 5 4.00 05/14/1999 28 Sampled from truck. This report is exclusively for the use of tim clicnt indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. O1LI. Page I of 6 CONCRETE COMPREoSIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/16/1999 Report No.: 9910793 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT r~ATE: 04/16/1999 BATCHTIME: 9:15am ~'LANT: On-site TIME SAMPLED: 9:20am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 48 ¥ CONCRETE: 64 g SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A MR: 4-6% AIR CONTENT (%): 4.75 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 10' W of E form in strip 47 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.50 04/19/1999 3 65360 2310 2 2 3.50 04/23/1999 7 82950 2930 2 3 3.50 04/23/1999 7 72030 2550 Average 2740 2 4 3.50 05/14/1999 28 2 5 3.50 05/14/1999 28 Sampled from truck. This report is exclusively for tile use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 6 CONCRETE COMPREoSIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/16/1999 BATCH TIME: 12:00pm PLANT: On-site TIME SAMPLED: 12:05pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 58 F CONCRETE: 64 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Sec page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 15' W of E form in strip 42 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 3.50 04/19/1999 3 63070 2230 3 2 3.50 04/23/1999 7 87130 3080 3 3 3.50 04/23/1999 7 88200 3120 Average 3100 3 4 3.50 05/14/1999 28 3 5 3.50 05/14/1999 28 Sampled from truck. This report is exclusively for the use of the client iudicaled above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011.1. Page 3 of 6 CONCRETE COMPREoSIVE STRENGTH TES_ ENGINEERI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. malty CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/16/1999 BATCH TIME: 12:45pm PLANT: On-site TIME SAMPLED: 12:50pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy SXmSNGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 60 F CONCRETE: 65 F SLUMP: i-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 100' W of E form in strip 42 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 4.00 04/19/1999 3 64930 2300 4 2 4.00 04/23/1999 7 92970 3290 4 3 4.00 04/23/1999 7 93850 3320 Average 3310 4 4 4.00 05/14/1999 28 4 5 4.00 05/14/1999 28 Sampled from truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011.L l'age 4 of 6 CONCRETE COMPREoSIVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCaETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/16/1999 BATCHTIME: 2:00pm PLANT: On-site TIME SAMPLED: 2:05pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 61 F CONCRETE: 65 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 30' E of W form in strip 41 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESS IVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 4.00 04/19/1999 3 73710 2610 5 2 4.00 04/23/1999 7 106170 3750 5 3 4.00 04/23/1999 7 97810 3460 Average 3610 5 4 4.00 05/14/1999 28 5 5 4.00 05/14/1999 28 Sampled from truck. This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 6 CONCRETE COMPRL- SIVE STRENGTH ENGINF_ERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/16/1999 BATCH TIME: 3:55pm PLANT: On-site TIME SAMPLED: 4:00pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 65 V CONCRETE: 66 v SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page l ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 3.50 04/19/1999 3 81860 2890 6 2 3.50 04/23/1999 7 107790 3810 6 3 3.50 04/23/1999 7 98090 3470 Average 3640 6 4 3.50 05/14/1999 28 6 5 3.50 05/14/1999 28 Sample location: 25' N of S form in E fire lane at south end Sampled at truck. Technician: Greg Dimock Started: 6:00am Finished: 5:00pm ~ Enginoori~&n~ Report Distribution: ( 1 ) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour ¢1) City of Grapevine Vice President ( 1 ) City of Coppell This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lnc, 0ILL Page 6 of 6