Loading...
Fellowship-LR 990518'CONCRETE COMPRLSSIVE STRENGTH TE5 2 $901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 05/18/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA ('()NTRACTOR: Julian P. Ban-y CONCRETE CLASS: FC-M ~'oX('m,:'rE SUPPL~:R: LH Lacy I'I,ACEMENT ~):XT~:: 04/16/1999 ~,XT(:n XmE: 8:25am Iq.:xx'r: On-site TIME SAMI'LEI): 8:30am 1¢~: Greg Dimock SI'I.X'IFI('ATION REQUIREMENTS WEATIIER CONI)ITIONS: Cloudy STREN(;Tll: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 47 F CONCRETE: 61 F Sl,VMI': 1-3" TRUCK NO: N/A TICKET NO: N/A .Xl[t: 4-6% AIR CONTENT IC/~): 5.0 UNIT WE~(;HT (poi): 148.9 I I{S'l' MI{TII()I): ASTM C- 143 I'LA(~EMENT LO(TATION: I'ax mg-Slrips 48.47.42.41. east fire lane from cnlrx road ill cul-de-sac Io strip 54 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 75' W of E form in strip 48 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYIANDER MEASUREI) MAXIMUM COMPRESSIVE MARKEI) SLUMP I)ATE AGE LOAD STRENGTh FRACTURE SET NO. (inches) TESTEI) (days) (lbs. force) (psi) TYPE I I 4.00 04/19/1999 3 66140 2340 I 2 4.00 04/23/1999 7 96210 3400 ! 3 4.00 04/23/1999 7 92160 3260 Average 3330 I 4 4.00 /)5/14/1999 28 132190 4670 I 5 4.00 05/14/1999 28 130350 4610 Average 4640 Sampled from ~ruck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. ttlL[~ Page 1 of 6 CONCRETE COMPRLJSIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 05/18/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M (?ONCRETE SUI'PI.1ER: LH Lacy PLACEMENT I)ATE: 04/16/1999 BATCI! TIME: 9: 15am PI,ANT: On-site TIME SAMPI,ED: 9:20am t~v: Greg Dimock SI'ECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 48 F CONCRETE: 64 F SI,UMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENI (%): 4.75 UNIT WEIGilT (pcf): N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: Sec page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: 10' W of E t'orm in strip 47 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYIANDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTh FRACTURE SET' NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.50 04/19/1999 3 65360 2310 2 2 3.50 04/23/1999 7 82950 2930 2 3 3.50 04/23/1999 7 72030 2550 Average 2740 2 4 3.50 05/14/1999 28 120300 4250 2 5 3.50 05/14/1999 28 132860 4700 Average 4480 Sampled from truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 2 of 6 CONCRETE COMPREoSIVE STRENGTH TES l ENGINFY_RI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 05/18/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUI'I'IAER: LH Lacy I'I,ACE'MENT I)ATE: 04/16/1999 BATCII TIME: 12:00pm I'i,ANT: On-site TIME SAMPLED: 12:05pm i;'v: Greg Dimock SPECIFICATI()N RI.:QUIREMENTS WEATIlER CONI)ITIONS: Partly cloudy STRENGTIk 3(X)0 psi @ 28 Days TEMPERATUR3; (V)- AIR 58 r CONCRETE: 64 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.0 UNIT WEIGIIT (pcf): N/A TEST METIlOI): ASTM C- 143 PI~ACEblENT IA)CATION: Sec page 1 ASTM C-172 ASTM ('-39 SAMI'LE IA)CATION: 15' W of E form in strip 42 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASUREI) MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 3.5{) 04/19/1999 3 63070 2230 3 2 3.50 04/23/1999 7 87130 3080 3 3 3.50 04/23/1999 7 88200 3120 Average 3100 3 4 3.50 05/14/1999 28 110310 3900 3 5 3.50 05/14/1999 28 114010 4030 Average 3970 Sampled frOrTL Eruck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 3 of 6 CONCRETE COMPREoSIVE STRENGTH TES. ENGINEF_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 05/18/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CoN'raACTOR: Julian P. Barry CONCmCTE CLASS: FC-M (~ONCRETE SUI'PI.IER: LH Lacy PI,ACEMENT DATE: 04/16/1999 BATCh TIMV:: 12:45pm PLANT: On-site T~ME SAMPLED: 12:50pm BY: Greg Dimock SPI.X;IFICATION REQUIREMENTS WEATIIER CONI)IT1ONS: Partly cloudy STRENGTII: 3(F00 psi @ 28 Days TEMI'ERATUm; (V)- AIR 60 V CONCRETE: 65 I: SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A MR: 4-6~J AIR CON.I'ENT (%): 5.0 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Sec page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: 100' W of E form in strip 42 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASUREI) MAXIMUM COMI'RESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRAC'IIJRE SET NO. (h~ches) TESTED (days) (lbs. force) (psi) TYPE 4 I 4.00 04/19/1999 3 64930 2300 4 2 4.00 04/23/1999 7 92970 3290 4 3 4.00 04/23/1999 7 93850 3320 Average 3310 4 4 4.00 05/14/1999 28 124380 4400 4 5 4.00 05/14/1999 28 126600 4480 Average 4440 Sampled from truck. This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 6 CONCRETE COMPRLoSIVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 05/18/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUI'PI,IER: LH Lacy PLACEMENT DATE: 04/16/1999 B,XTCII TIME: 2:00pm I'LANT: On-site TIME SAMi'LEI): 2:05pm BY: Greg Dimock SI'I.;CIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy STRENGTh: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 61 F CONCRETE: 65 F SLUMI': 1-3" TRUC~NO: N/A TIC[ETNO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WE1GIlT (pcf): N/A TEST METIIOD: ASTM C- 143 PI,ACEMENT IA)CATION: ,";cc page I ASTM C-172 ASTM C-39 SAMPI~E LOCATION: 30' E of W form in strip 41 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 4.00 04/19/1999 3 73710 2610 5 2 4.00 04/23/1999 7 106170 3750 5 3 4.00 04/23/1999 7 97810 3460 Average 3610 5 4 4.00 05/14/1999 28 142520 5040 5 5 4.00 05/14/1999 28 142780 5050 Average 5050 Sampled ffrom ~ruck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 6 CONCRETE COMPRE ,SIVE STRENGTH TES. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910793 Report Date 05/18/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPIAER: LH Lacy PLACEMENT DATE: 04/16/1999 BATCII TIME: 3:55pm I'I,ANT: On-site TIblESAMPLED: 4:00pm ~V: Greg Dimock SPE(?IFI(?ATION REQUIREMENTS WEATIIER CONDITIONS: Clear STREN(;Tn: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 66 ~' SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 5.0 UNIT WEIGIIT (pcfi: N/A 'rEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Sec page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED blAXIMUM COMPRESSIVE bLs, RKED SLUMP DATE A G E LOAD STRENGTI I FRA CTU RE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 3.50 04/19/1999 3 81860 2890 6 2 3.50 04/23/1999 7 107790 3810 6 3 3.50 04/23/1999 7 98090 3470 Average 3640 6 4 3.50 05/14/1999 28 145680 5150 6 5 3.50 05/14/1999 28 140560 4970 Average 5060 Sample location: 25' N of S form in E fire lane at south end Sampled at truck. TReport echnician: Greg Dimock Distribution: Started: 6:00am Finish ed: 5:00pm ·.~E n~eeri. -~Inc. (1) Julian P. Barry General Contractors ( 1 ) Urban Architecture e arbour (1) City of Grapevine i't ~ Vice/qfresident ( 1 ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 6 of 6