Loading...
Fellowship-LR 990426 (2)CONCRETE COMPREoSIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16/1999 Report No.: 9910828 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: 5 1/2 Sack CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 04/16/1999 BATCH TIME: 4:25pm PLANT: Batch Truck TIME SAMPLED: 4:30pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 65 F CONCRETE: 66 ~ SLUMP: 5.0" Max TRUCK NO: 431 TICKET NO: 169569 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Inlets at strip//49 & milddle fire lane, east end of strip 29 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.00 04/23/1999 7 100500 3550 1 2 5.00 04/23/1999 7 97810 3460 Average 3510 1 3 5.00 05/14/1999 28 1 4 5.00 05/14/1999 28 Sample location: First lift of inlet at strip #49. Technician time: See Report #9910793 Sampled at truck. ~ Technician: Greg Dimock Started: Finished: ~ Engi~c.' g, Inc. Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour ( I ) City of Grapevine Vice President ( 1 ) City of Coppell This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1