Loading...
Fellowship-LR 990423REPORT OF CONCRI-.:E INSPECTION " ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/15/1999 Report No.: 9910675 Report Date 04/23/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Concrete inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for concrete inspection. Upon arrival was informed of cancellation due to rain. Technician time: 6:00 am to 8:00 am Technician: Greg Dimock ~ Eng,, Inc. Report Distribution: (1) Julian P. Barry General Contractors ( I ) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) Git}, of Coppcll This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1