Fellowship-LR 990423REPORT OF CONCRI-.:E INSPECTION "
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/15/1999 Report No.: 9910675 Report Date
04/23/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Concrete inspection.
On this date, an HBC Engineering technician arrived at the above referenced
jobsite as scheduled for concrete inspection. Upon arrival was informed of
cancellation due to rain.
Technician time: 6:00 am to 8:00 am
Technician: Greg Dimock ~ Eng,, Inc.
Report Distribution:
(1) Julian P. Barry General Contractors
( I ) Urban Architecture Eugene Harbour
(1) City of Grapevine Vice President
(1) Git}, of Coppcll
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 1 of 1