Fellowship-LR 990513CONCRETE COMPRLdSIVE STRENGTH TES
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/13/1999 Report No.: 9910455 Report Date
05/13/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A
CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 04/13/1999 BATCH TIME: 3:40pm
PLANT: N/A TIME SAMPLED: 3:45pm By: Greg Dimock
SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy
STRENGTh: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 80 F CONCRETE: 82 F
SLtn~le: 5.0" Max TRUCK NO: 437 TICKET NO: N/A
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A
TEST METIIOI): ASTM C- 143 PLACEMENT LOCATION:
3 Inlet tops at strips 48, south side at island at cast end of strips 1732 & 3/22
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCUMULATIVE Yam)s: 6
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) TESTEI) (days) (liDs. force) (psi) TYPE
I I 4.00 04/20/1999 7 114790 4060
I 2 4.00 04/20/1999 7 121980 4310
Average 4190
I 3 4.00 05/11/1999 28 165980 5870
I 4 4.00 05/11/1999 28 162630 5750
Average 5810
Technician ~ime: See Report #9910432
Sampled at truck.
Technician: Greg Dimock Started: Finished:
n
Report Distribution:
( 1 ) Julian P. Barry General (}l)nlracto~s
(1) Urban Architecture Eu~en~ Harbour
( 1 ) City of Grapevine Vice President
( 1 ) City of Coppell
This report is exclusively lbr thc usc of tile client indicated above and shall not be reproduced exccpl in full without tile written approval of HBC Engineering, Inc.
01lA~ Page I of I