Loading...
Fellowship-LR 990513CONCRETE COMPRLdSIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1999 Report No.: 9910455 Report Date 05/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 04/13/1999 BATCH TIME: 3:40pm PLANT: N/A TIME SAMPLED: 3:45pm By: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTh: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 80 F CONCRETE: 82 F SLtn~le: 5.0" Max TRUCK NO: 437 TICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A TEST METIIOI): ASTM C- 143 PLACEMENT LOCATION: 3 Inlet tops at strips 48, south side at island at cast end of strips 1732 & 3/22 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE Yam)s: 6 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTEI) (days) (liDs. force) (psi) TYPE I I 4.00 04/20/1999 7 114790 4060 I 2 4.00 04/20/1999 7 121980 4310 Average 4190 I 3 4.00 05/11/1999 28 165980 5870 I 4 4.00 05/11/1999 28 162630 5750 Average 5810 Technician ~ime: See Report #9910432 Sampled at truck. Technician: Greg Dimock Started: Finished: n Report Distribution: ( 1 ) Julian P. Barry General (}l)nlracto~s (1) Urban Architecture Eu~en~ Harbour ( 1 ) City of Grapevine Vice President ( 1 ) City of Coppell This report is exclusively lbr thc usc of tile client indicated above and shall not be reproduced exccpl in full without tile written approval of HBC Engineering, Inc. 01lA~ Page I of I