Loading...
Fellowship-LR 990513 (2)'CONCRETE COMPRLJSIVE STRENGTH TES 2 ENGINEERINg3, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1999 Report No.: 9910432 Report Date 05/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRI~;TESUPI'LIER: LH Lacy Iq. ACEMENTDATE: 04/13/1999 BATClITIME: 12:00pm PLANT: On-site Tree SAMPI~ED: 12:06pm ~Y: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDrrIONS: Cloudy STRENGTII: 3000 psi @ 28 Days TEMI'ERaTUm; (V)- AIR 72 V CONCmaTE: 75 ~' SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 4.75 UNIT WEIGIIT (pcf): N/A TEST METIIOI): ASTM C- 143 PLACEMENT LOCATION: Paving- parking cud caps at strips 39. I. 20, 4, 23.5.24, 8, 28 at west fire lane and island ASTM C- 172 ~,r~ at strips ASTM C-39 {continued bclox, ) SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASUREI) MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 4.50 04/! 6/1999 3 57290 2030 I 2 4.50 04/20/1999 7 78920 2790 I 3 4.50 04/20/1999 7 87630 3100 Average 2950 1 4 4.50 05/11/1999 28 102770 3630 I 5 4.50 05/11/1999 28 98730 3490 Average 3560 Placement location continued: 11/31, 12/32. Approach to middle fire lane from nerth a~ north fire lane and west fire lane ~ie ins in¢o existing parking le~ at This repot! is exclusively lk)r the usc of thc client indicated above and shall nol bc reproduced except m full withou! lhe written approval of [t11(; Engineering, Inc. 0ILI. Page I of 3 Report No.: 9910432 strip 28/42 at west end and 15/35 at west end. Approach to entry road at North Street. Sample location: North approach to middle fire lane, from north fire lane. This report is exclusively fi)r the use of lhc client indicalcd above and shall not be reproduced except in full wilhoul the wrillen approval of tt 13(' Engineering, Inc. OI I.i, Page 2 o1' 3 CONCRETE COMPRLoSIVE STRENGTH TES. ENGINEERING. INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1999 Report No.: 9910432 Report Date 05/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETESm'I'LIER: LH Lacy PI,ACEMENTDATE: 04/13/1999 UATCnTIME: 4:05pm I'LANT: On-site Tree SAMPLEI): 4: 10pm wY: Greg Dimock SPECIFICATION REQUIREMENTS WEATI1ER CONDITIONS: Cloudy STRENGTII: 3000 psi @ 28 Days TEMI'ERATURE (V)- AIR 82 V CONCRETE: 84 ~' SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% Am CONTENT (%): 4.5 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 I'LACEMENT LOCATION: Sec page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP I)ATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 4.50 04/16/1999 3 82050 2900 2 2 4.50 04/20/1999 7 108280 3830 2 3 4.50 04/20/1999 7 106570 3770 Average 3800 2 4 4.50 05/1 l / 1999 28 147900 5230 2 5 4.50 05/11 / 1999 28 135620 4800 Average 5020 Sample location: Approach to entry road at north end of project. Sampled at truck. Technician: Oreg Dimock Started: 6:00am l:inished: 5:30pm ~ En~ Report l)istribution: ( I ) Julian P. 1½arry (;cncml / 1) [ Irban Architcctm'c Eugell¢ Harbour (1) Cit5 of(h-apevine Vice Pr¢.sidcnt [ I ) (?it5' of Coppcll This report is exclusively lk~r thc usc of thc client indicated above and shall not bc reproduced cxccpl in full without thc written approval of ItBC Engineering. Inc. OILI; Page 3 of 3