Loading...
Fellowship-LR 990421 (2)'CONCRETE COMPR._3SIVE STRENGTH TEL £ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/12/1999 Report No.: 9910310 Report Date 04/21/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field te§t.and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/12/1999 BATCHTIME: 1 l:15am PLANT: On-site TIME SAMPLED: 1 l:20am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 64 F CONCRETE: 72 r SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.0 UNIT WEIGHT (pcf): N/g TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving-Island drive thru's at west end of strips 22/6, 25/7,27/10 & east end of strips 39/1, ASTM C- 172 20/4, 23/5, 24/8 & 28 & west end, island drive thru's for strips 39/1, 20/4, 23/5, 24/8 & 28 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 2.50 04/15/1999 3 91420 3230 1 2 2.50 04/19/1999 7 99490 3520 1 3 2.50 04/19/1999 7 97240 3440 Average 3480 1 4 2.50 05/10/1999 28 1 5 2.50 05/10/1999 28 Sample location: Drive thru at eas~ end of paveing strips 39 & ~1 This report is exclusively for thc use of the client indicated above and shall not be rcproduced except in full without thc xvritten approval of HBC Engineering, [nc. OILIJ Page 1 of 2 CONCRETE COMPR_,SSIVE STRENGTH TE F ENGINEER]I'~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/12/1999 Report No.: 9910310 Report Date 04/21/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field te'~t and cast compressive strength samples. PROJECT DATA CONTaACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/12/1999 BATCH TIME: 2:35pm PLANT: On-site TIME SAMPLED: 2:40pm }~V: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (V)- AIR 84 F CONCRETE: 86 V SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METItOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 3 CYLINDER MEASURED MAXIMUM COMPRESSIVE MA RI(ED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.00 04/15/1999 3 75260 2660 2 2 5.00 04/19/1999 7 90020 3180 2 3 5.00 04/19/1999 7 94130 3330 Average 3260 2 4 5.00 05/10/1999 28 2 5 5.00 05/10/1999 28 Sample location: Drive thru between strips #1 & #20 at west end of west fire lane. Technician: Greg Dimock Started: 6:00am Finished: 4:30pm ~ Elioine~~nc. Report Distribution: ( 1 ) Julian P. Barry General Contractors ( 1 ) Urban Architecture Eugene Harbour ( I ) City of Grapevine Vice President ( 1 ) City of Coppcll This report is exclusively for the use oftbe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 2