Loading...
Fellowship-LR 990421 (3)CONCRETE COMPRE_SIVE STRENGTH TES._ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1999 Report No.: 9910455 Report Date 04/21/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - E_xpansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field tesf and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 04/13/1999 BATCH TIME: 3:40pm PLANT: N/A TIME SAMPLED: 3:45pm ~v: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 80 F CONCRETE: 82 F SLUMP: 5.0" Max TRUCK NO: 437 TICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: 3 Inlet tops at strips 48, south side at island at east end of strips 12132 & 3/22 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 6 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.00 04/20/1999 7 114790 4060 1 2 4.00 04/20/1999 7 121980 4310 Average 4190 I 3 4.00 05/11/1999 28 1 4 4.00 05/11/1999 28 Technician time: See Report #9910432 Sampled at truck. ReportTechnician:Distribution:Greg Dimock Started: Finished: m~ Engina~~nc. (I) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (I) City of Grapevine Vice President ( I ) City of Coppell This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1