Fellowship-LR 990421 (3)CONCRETE COMPRE_SIVE STRENGTH TES._
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/13/1999 Report No.: 9910455 Report Date
04/21/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - E_xpansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field tesf and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A
CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 04/13/1999 BATCH TIME: 3:40pm
PLANT: N/A TIME SAMPLED: 3:45pm ~v: Greg Dimock
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 80 F CONCRETE: 82 F
SLUMP: 5.0" Max TRUCK NO: 437 TICKET NO: N/A
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
3 Inlet tops at strips 48, south side at island at east end of strips 12132 & 3/22
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCUMULATIVE YARDS: 6
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 4.00 04/20/1999 7 114790 4060
1 2 4.00 04/20/1999 7 121980 4310
Average 4190
I 3 4.00 05/11/1999 28
1 4 4.00 05/11/1999 28
Technician time: See Report #9910432
Sampled at truck.
ReportTechnician:Distribution:Greg Dimock Started: Finished: m~ Engina~~nc.
(I) Julian P. Barry General Contractors
(1) Urban Architecture Eugene Harbour
(I) City of Grapevine Vice President
( I ) City of Coppell
This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 1