Loading...
Fellowship-LR 990512CONCRETE COMPREoSIVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/10/1999 Report No.: 9910221 Report Date 05/12/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIEg: LH Lacy PLACEMENT DATE: 04/10/1999 BATCll TIME: 8:15am PLANT: On-site TIME SAMPLED: 8:20am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 68 F CONCRETE: 68 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Island curbs and drive thru's at paving strips #10/27.7/25.6/22, 3/21 & 2 at east fire lane ASTM C- 172 ASTM C-39 SAMPLE LOCATION: At dave thru paving strips 7/25 REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (h~chcs) TESTED (days) (lbs. force) (psi) TYPE 1 I 4.00 04/13/1999 3 80280 2840 1 2 4.00 04/17/1999 7 92460 3270 1 3 4.00 04/17/1999 7 98090 3470 Average 3370 I 4 4.00 05/08/1999 28 126410 4470 I 5 4.00 05/08/1999 28 123250 4360 Average 4420 ReportTechnician:Distribution:Greg Dimock Started: 6:00aln Finished: 12:00pm I'-~ .~~18, Inc. ( I ) Julian P. Barry General Contractors ( 1 ) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President ( I ) City of Coppcll This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011,1. Page I of 1