Fellowship-LR 990512CONCRETE COMPREoSIVE STRENGTH TES_
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/10/1999 Report No.: 9910221 Report Date
05/12/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M
CONCRETE SUPPLIEg: LH Lacy PLACEMENT DATE: 04/10/1999 BATCll TIME: 8:15am
PLANT: On-site TIME SAMPLED: 8:20am BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy
STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 68 F CONCRETE: 68 F
SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A
AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGIIT (pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Island curbs and drive thru's at paving strips #10/27.7/25.6/22, 3/21 & 2 at east fire lane
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: At dave thru paving strips 7/25
REPORT OF TESTS ACCUMULATIVE YARDS: 8
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (h~chcs) TESTED (days) (lbs. force) (psi) TYPE
1 I 4.00 04/13/1999 3 80280 2840
1 2 4.00 04/17/1999 7 92460 3270
1 3 4.00 04/17/1999 7 98090 3470
Average 3370
I 4 4.00 05/08/1999 28 126410 4470
I 5 4.00 05/08/1999 28 123250 4360
Average 4420
ReportTechnician:Distribution:Greg Dimock Started: 6:00aln Finished: 12:00pm I'-~ .~~18, Inc.
( I ) Julian P. Barry General Contractors
( 1 ) Urban Architecture Eugene
Harbour
(1) City of Grapevine Vice President
( I ) City of Coppcll
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
011,1. Page I of 1