Loading...
Fellowship-LR 990511 (2)CONCRETE COMPREoSIVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/09/1999 Report No.: 9910152 Report Date 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/09/1999 BATCII TIME: 8:35am PLANT: On-site TIME SAMPLED: 8:40am BY: Greg Dimock SPECIIqCATION REQUIREMENTS WEATIlER CONDITIONS: Partly cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE {F)- AIR 64 F CONCRETE: 68 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 3.75 UNIT WEIGIIT (pct'): N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: Paving- middle fire lane from cast to west, island curbs at strips 32, 12, 13, 33, 16, 36, 18, ASTM C-172 37, in addition to fire lanes and curbs they are ASTM C-39 SAMPLE LOCATION: 100' E of W form in middle fire lan REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.00 04/12/1999 3 68610 2430 1 2 3.00 04/16/1999 7 88530 3130 1 3 3.00 04/16/1999 7 92440 3270 Average 3200 I 4 3.00 05/07/1999 28 108760 3850 I 5 3.00 05/07/1999 28 108930 3850 Average 3850 Placement location: pouring a section of paving in between strip 11 and 30 to the west of east fire lane This report is exclusively for the usc of the client indicated above and shall not be reproduced excepl in full without thc written approval of HBC Engineering, Inc. OIl. L Page I of 4 Report No.: 9910152 Note: Sampled at truck. This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full wilhout the wrilten approval of HBC Engineering, lnc, 01LL Page 2 of 4 CONCRETE COMPRL, SIVE STRENGTH TE£ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/09/1999 Report No.: 9910152 Report Date 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppeli, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/09/1999 BATCIt TIME: 9:10am PLANT: On-site TIME SAMPLED: 9: 15am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (g) - AIR 67 F CONCRETE: 70 F SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.25 UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 210/E of W form in middle fire lan REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.00 04/12/1999 3 67250 2380 2 2 3.00 04/16/1999 7 94410 3340 2 3 3.00 04/16/1999 7 92720 3280 Average 3310 2 4 3.00 05/07/1999 28 108970 3850 2 5 3.00 05/07/1999 28 116140 4110 Average 3980 This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 3 of 4 CONCRETE COMPRE. SIVE STRENGTH TLS. ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/09/1999 Report No.: 9910152 Report Date 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/09/1999 BATCHTIME: l:55pm PLANT: On-site TIME SAMPLED: 2:00pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONmTIONS: Partly cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 85 F CONCRETE: 84 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcB: 147.3 TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Se page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 4.00 04/12/1999 3 68690 2430 3 2 4.00 04/16/1999 7 85540 3020 3 3 4.00 04/16/1999 7 87910 3110 Average 3070 3 4 4.00 05/07/1999 28 110500 39 I0 3 5 4.00 05/07/1999 28 110540 3910 Average 3910 Sampled at truck. Sample location: 30' W of E fire lane joint & 6' N of paving strip 11 Technician: Greg Dimock Started: 6:(X)am Finished: 3:30pm ~ Engine'6. Report Distribution: ( 1 ) Julian I'. Barry General Contractors (1) Urban Architecture Eugene Harbour ( 1 ) City of Grapevine Vice President (1) City of Coppell This report is exclusively for thc usc of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 011.1~ Page 4 o1'4