Loading...
Fellowship-LR 990420 (3)CONCRETE COMPREoSIVE STRENGTH TLS. 8901 Carpenter Frw. y., Suite #100 Dallas, Texas 75247 Date of Service: 04/09/1999 Report No.: 9910152 Report Date 04/20/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road · Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/09/1999 BATC~tTIME: 8:35am PLANT: On-site TIME SAMPLED: 8:40am 1}¥: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 64 E CONCRETE: 68 E SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 3.75 UNIT WEIGHT (pcf): N/A TEST METItOD: ASTM C-143 PLACEMENT LOCATION: Paving- middle fire lane from east to west, island curbs at strips 32, 12, 13, 33, 16, 36, 18, ASTM C- 172 37, in addition to fire lanes and curbs they are ASTM C-39 SAMPLE LOCATION: 100' E of W /'()rill in middle fire lan REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 3.00 04/12/1999 3 68610 2430 I 2 3.00 04/16/1999 7 88530 3130 1 3 3.00 04/16/1999 7 92440 3270 Average 3200 I 4 3.00 05/07/1999 28 1 5 3.00 05/07/1999 28 Placement location: pouring a section of paving in between strip 11 and 30 to the west of east fire lane This report is exclusively for thc usc of thc client indicatcd above and shall not be reproduced except in full witbout thc w, ritlcn approval of H IgC Engineering, Inc. 011.l. Page 1 of 4 .Report No.: 9910152 Note: Sampled at truck. This repot! is exclusively for thc use uf thc cliem indicated above and shall not be reproduced except in full without thc writlcn approval of HBC Eugineering. Inc. 011.I. Page 2 of 4 CONCRETE COMPRLoSIVE STRENGTH TE&_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/09/1999 Report No.: 9910152 Report Date 04/20/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road ~ Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/09/1999 nATrIt TIME: 9:10am PLANT: On-site TIME SAMPLED: 9: 15am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 67 F CONCRETE: 70 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.25 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 210/E of W form in middle fire lan REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 3.00 04/12/1999 3 67250 2380 2 2 3.00 04/16/1999 7 94410 3340 2 3 3.00 04/16/1999 7 92720 3280 Average 3310 2 4 3.00 05/07/1999 28 2 5 3.00 05/07/1999 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of }IBC Engineering, Inc. 01LL Page 3 of 4 CONCRETE COMPRE_$IVE STRENGTH TLS_ ENGINEERING, 1NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/09/1999 Report No.: 9910152 Report Date 04/20/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road ' Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/09/1999 BATCH TIME: l:55pm PLANT: On-site TIME SAMPLED: 2:00pm aY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (V)- AIR 85 V CONCRETE: 84 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 147.3 TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Se page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 4.00 04/12/1999 3 68690 2430 3 2 4.00 04/16/1999 7 85540 3020 3 3 4.00 04/16/1999 7 879 l0 3110 Average 3070 3 4 4.00 05/07/1999 28 3 5 4.00 05/07/1999 28 Sampled at truck. Sample location: 30' W of E fire lane joint & 6' N of paving strip 11 Technician: Greg Dimock Started: 6:00am Finished: 3:30pm I--~ Eneirlt~, Inc. Report l)istril)ution: { ! ) Julian P. Barry General Contractors ~ ( 1 ) Urban Architecture Eugene HarboLlr (1~ City of Grapevine Vice President ( 1 ) City of Coppcll This report is exclusively for the usc of the clicnt indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, inc. 0ILL Page 4 of 4