Loading...
Fellowship-LR 990416CONCRETE COMPREo$IVE STRENGTH TES ~ ENGINEF_RII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 04/16/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCItTIME: 7:40am PLANT: On-site TIME SAMPLED: 7:47am aY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (g)- AIR 68 F CONCRETE: 71 V SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% Am CONTENT (%): 3.75 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Paving- Fire lane ASTM C-172 ASTM C-39 (See attached sketch) SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 3.00 04/11/1999 3 77120 2730 I 2 3.00 04/15/1999 7 77750 2750 I 3 3.00 04/15/1999 7 81410 2880 Average 2820 I 4 3.00 05/06/1999 28 I 5 3.00 05/06/!999 28 Sample location: 75' South of north form in west fire lane Ail sets were sampled at truck. This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without lhe written approval of HBC Engineering, Inc. 01 I,I, Page 1 of 6 CONCRETE COMPRE,_,$IVE STRENGTH TES. ENGINEF_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 04/16/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase II1 - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCH TIME: 9:50am PLANT: On-site TIME SAMPLED: 9:54am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 68 F CONCRETE: N/A v SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.00 04/11/1999 3 83710 2960 2 2 3.00 04/15/1999 7 86910 3070 2 3 3.00 04/15/1999 7 90350 3190 Average 3130 2 4 3.00 05/06/1999 28 2 5 3.00 05/06/1999 28 Sample location: 40' South of north form in south section of west fire lane This report is exclusively for the use of thc client indicated above and shall not bc reproduced except in I'ull without thc written approval of H IgC Engineering, Inc. IIILL Page 2 of 6 CONCRETE COMPRE ,$IVE STRENGTH TES . - ENGINF. ERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 04/16/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCH TIME: 10:30am PLANT: On-site TIME SAMPLED: 10:36am DY: Greg Dimock SPECIFICATION REQUIREMENTS WEATttER CONDITIONS: Partly cloudy STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (v)- AIR 69 V CONCRETE: 72 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page l ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 3.00 04/11/1999 3 65460 2310 3 2 3.00 04/15/1999 7 79660 2820 3 3 3.00 04/15/1999 7 82970 2930 Average 2880 3 4 3.00 05/06/1999 28 3 5 3.00 05/06/1999 28 Sample location: 100' South of north form in south section of west fire lane This report is exclusively for the use of the client iudicatcd above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011.L Page 3 of 6 CONCRETE COMPRL SIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 04/16/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT I)ATE: 04/08/1999 BATCH TIME: 11:09am PLANT: On-site TIME SAMPLED: 1 1:14am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 69 F CONCRETE: 72 g SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcO: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 3.00 04/11/1999 3 60430 2140 4 2 3.00 04/15/1999 7 81110 2870 4 3 3.00 04/15/1999 7 83670 2960 Average 2920 4 4 3.00 05/06/1999 28 4 5 3.00 05/06/1999 28 Sample location: 50' East of west form in south fire lane This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0ILl. Page 4 of 6 CONCRETE COMPRE ,SIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 04/16/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCIt TIME: N/A PLA~rr: On-site TIME SAMPLED: N/A BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CO~ITIONS: Partly cloudy STRENaTm 3000 psi @ 28 Days TEMPERATURE (F)- AIR 70 F CONCRETE: 73 F SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.25 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 3.00 04/11 / 1999 3 76240 2700 5 2 3.00 04/15/1999 7 87420 3090 5 3 3.00 04/15/1999 7 89610 3170 Average 3130 5 4 3.00 05/06/1999 28 5 5 3.00 05/06/1999 28 Sample location: 150' East of west form in south fire lane This report is exclusively for the use of thc client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering. Inc. OI I,I, Page 5 of 6 · CONCRETE COMPRL3SIVE STRENGTH TEL .' ~ ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 04/16/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCHTIME: 12:15pm PLANT: On-site TIME SAMPLED: 12:20pm nY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 70 F CONCRETE: 73 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 14.5 UNIT WEIGHT (pcf): 147.3 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See be]ow REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH 'FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 3.00 04/11/1999 3 74560 2640 6 2 3.00 04/15/1999 7 83640 2960 6 3 3.00 04/15/1999 7 87900 3110 Average 3040 6 4 3.00 05/06/1999 28 6 5 3.00 05/06/1999 28 Sample location: 250' East of west form in south fire lane Technician: Oreg Dimock Started: 6:00am Finished: 5:30pm m~ Eneinee~J~' Report Distribution: (I) Julian P. Barry General Contractors ( I ) Urhan Architecture Eugene Harbour (I) City of Grapevine Vice President ( I ) City of Coppcll This report is exclusively for the use of the client indicated above and shall not bc reproduced except m Ihll without the written approval of HBC Engineering, Inc. 01LL Page 6 of 6