Loading...
Fellowship-LR 990511 (3)CONCRETE COMPRL. 4SIVE STRENGTH TES f 8901 Carpenter Frwy., Suite//100 Dallas, Texas 75247 Report Date Date of Service: 04/08/1999 Report No.: 9909987 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCII TIME: 7:40am PLANT: On-site T1MESAMPLED: 7:47am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 68 V CONCRETE: 71 V SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: '4-6% AIR CONTENT (%): 3.75 UNIT WEIGIIT (pcf): N/A TEST METI[OD: ASTM C- 143 PLACEMENT LOCATION: Paving- Fire lane ASTM C- 172 ASTM C-39 (Sec attached sketch) SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXII~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 3.00 04/11/1999 3 77120 2730 I 2 3.00 04/15/1999 7 77750 2750 1 3 3.00 04/15/1999 7 81410 2880 Average 2820 I 4 3.00 05/06/1999 28 129480 4580 I 5 3.00 05/06/1999 28 133830 4730 Average 4660 Sample location: 75' South of north form in west fire lane Ail sets were sampled at truck. This rcporl is exclusively for Ihe use of thc client indicated above and shall not be rcproduccd except in full without the writtcn approval of HBC Engineering, lnc IIll~l, Page I of 6 CONCRETE COMPRLdSIVE STRENGTH TES'£ 8901 Carpenter Frwy., Suite/1100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian ?. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 SATCU TIME: 9:50am PLANT: On-site TIME SAMPLED: 9:54am sv: Greg Dimock SPECIFICATION REQUIREMENTS WEATltER CONDITIONS: Partly cloudy STRENGTIt: 3000 psi @ 28 Days TEMPERATURe; (F)- AIR 68 F CONCRETE: N/A F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGItT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Sec page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUmJLATIVEYA S: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.00 04/11/1999 3 83710 2960 2 2 3.00 04/15/1999 7 86910 3070 2 3 3.00 04/15/1999 7 90350 3190 Average 3130 2 4 3.00 05/06/1999 28 121220 4290 2 5 3.00 05/06/1999 28 119360 4220 Average 4260 Sample location: 40' South of north form in sou~h section of west fire lane This report is exclusively for thc usc of the clicm indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 2 of 6 CONCRETE COMPR , 4SIVE STRENGTH TES f ENGINF~_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENTS)ATE: 04/08/1999 BATClITIME: 10:30am PLANT: On-site TIME SAMPLED: 10:36am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONmTIONS: Partly cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 69 F CONCRETE: 72 ~ SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGItT (peri: N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASUREI) MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 3.00 04/l 1/1999 3 65460 2310 3 2 3.00 04/15/1999 7 79660 2820 3 3 3.00 04/15/1999 7 82970 2930 Average 2880 3 4 3.00 05/06/1999 28 110400 3900 3 5 3.00 05/06/1999 28 103090 3650 Average 3780 Sample location: 100' South of north form in south section of west fire lane This report is exclusively for thc use of thc client indicated above and shall no! be reproduced except in full without the written approval of HBC Engineering, Inc. l'age 3 ol' 6 CONCRETE COMPRLSSIVE STRENGTH TES £ 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/08/1999 Report No.: 9909987 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCtlTIME: I h09am PLANT: On-site TIME SAMPLED: 11' 14am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (g)- AIR 69 F CONCRETE: 72 V SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTll FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 3.00 04/11/1999 3 60430 2140 4 2 3.00 04/15/1999 7 81110 2870 4 3 3.00 04/15/1999 7 83670 2960 Average 2920 4 4 3.00 05/06/1999 9,28 107540 3800 4 5 3.00 05/06/1999 28 105420 3730 Average 3770 Sample location: 50' East of west form in south fire lane This ~cport is exclusively for thc usc of thc client indicated alcove and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. I'agc 4 of 6 CONCRETE COMPRL3SIVE STRENGTH TES £ ENGINEERI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1999 Report No.: 9909987 Report Date 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCH TIME: N/A PLANT: On-site TIME SAMPLED: N/A BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 70 g CONCRETE: 73 F St,UMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.25 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 3.00 04/11/1999 3 76240 2700 5 2 3.00 04/15/1999 7 87420 3090 5 3 3.00 04/15/1999 7 89610 3170 Average 3130 5 4 3.00 05/06/1999 28 120040 4250 5 5 3.00 05/06/1999 28 120240 4250 Average 4250 Sample location: 150' East of wes~ form in south fire lane This repot! is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0l I,I. Page 5 of 6 CONCRETE COMPRL3SIVE STRENGTH TES ,' ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/08/1999 Report No.: 9909987 05/11/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/08/1999 BATCIITIME: 12:15pm PLANT: On-site TIME SAMPLED: 12:20pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 70 I? CONCRETE: 73 SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIRCONTENT (%): 14.5 UNIT WEIGHT (pcl): 147.3 TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 3.00 04/11/1999 3 74560 2640 6 2 3.00 04/15/1999 7 83640 2960 6 3 3.00 04/15/1999 7 87900 3110 Average 3040 6 4 3.00 05/06/1999 28 115850 4100 6 5 3.00 05/06/1999 28 111270 3930 Average 4020 Sample location: 250' East of west form in south fire lane Technician: Greg Dimock Started: 6:00am Finished: 5:30pm En Report Distribution: ( 1 ) Julian P. Barry General Contractors (I) Urban Architecture Eugene Harbour (I) City of Grapevine Vice President ( I ) City of Coppcll This report is exclusively for tim use of the client indicated at×~vc and shall not bc reproduced except in full without the written approval of HDC Engineering. Inc. l'age 6 of 6