Fellowship-LR 990420 (2)REPORT OF CONCR2_rE INSPECTION
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/05/1999 Report No.: 9909678 Report Date
04/20/1999
Ciient No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Concrete inspection
On this date, an HBC Engineering technician arrived at the above referenced
jobsite as scheduled for concrete inspection. Upon arrival, technician was
informed by G.C.S.I. of cancellation due to weather conditions.
Technician time: 6:00 am to 8:00 am
Technician: Greg Dimock I'-I~ Engine~'~.~FInc. ~.--
Report Distribution:
(1) Julia,] P. Barry General Contractors --
(1) Urban Architectm'e F~lle H'firbour
( I ) City of Grapevine Vice President
( I ) City of Coppelt
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99LI.W l'a~e 1 of I