Loading...
Fellowship-LR 990414CONCRETE COMPREoSIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/02/1999 Report No.: 9909468 Report Date 04/14/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUH'LIER: LH Lacy PLACEMENT DATE: 04/02/1999 BATCH TIME: 9:40am ~'LA~r: On-site TIME SAMPLED: 9:45am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast STRENarm 3000 psi @ 28 Days TEMPERATURE (F)- AIR 70 V CONCRETE: 71 g SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Entry road at northeast comer of parking lot, from panel #40, east end road runs due north ASTM C-172 approx. 250'x 30' wide ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.00 04/05/1999 3 80050 2830 1 2 4.00 04/09/1999 7 85490 3020 I 3 4.00 04/09/1999 7 91590 3240 Average 3130 1 4 4.00 04/30/1999 28 1 5 4.00 04/30/1999 28 Sample location: 100' South of north form and 15' east of west form in north entry road This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 3 · Report No.: 9909468 Sample at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 3 · CONCRETE COMPRLoSIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/02/1999 Report No.: 9909468 Report Date 04/14/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/02/1999 BATCH TD, IE: 10:25am PLAttr: On-site TEME SAMPLED: 10:30am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 69 F CONCRETE: 72 F SLUMP: 1-3" TRUCKNO: N/A TICKETNO: NA AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.50 04/05/1999 3 79740 2820 2 2 3.50 04/09/1999 7 86050 3040 2 3 3.50 04/09/1999 7 83770 2960 Average 3000 2 4 3.50 04/30/1999 28 2 5 3.50 04/30/1999 28 Sample location: 40' North of south form and 15' east of west form in north entry/ road. Technician: Greg Dimock Started: 6:00am Finished: 12:00pm ~ Engine~g, Inc. Report Distribution: (1) Julian P. Barry General Contractors (I) Urban Architecture Eugene Harbour (I) City of Grapevine Vice President (I) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3