Fellowship-LR 990401REPORT OF REINFORCIN STEEL INSPECTION
8901 Caxpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/01/99 Report No.: 9909342
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
6616 Forest Park Rd. Phase III - Expansion
Dallas, TX 75235 Coppell, Texas
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: Contractor's drawings
Locations/Items Inspected: Paving Strips #43, #44 and #45
Test Method: Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X 2.olumn Tied Properly
Bar Size X Proper Bar Placement X l-les and Spaces
Bar Grade X Properly Tied X Stirrup Spacing/Type
~ebar Clean X Dowel Bars in Place X ~/elded Splices
:erin Clean X Proper Bar Supports X Mechanical Splices
qumber of Bars X Lapped Splices X Proper Cover
Discrepancies/Comments: No discrepancies noted at the time of inspection.
Technician: G. Dimock Started: Refer to Report #9909335
~ Engineering, Inc.
Report Distribution:
(1) Julian P. Barry General Contractors f,~ll~
(1) Urban Architecture
(1) City of Grapevine ~
(1) City of Coppell Eugene Harbour
Vice President