Loading...
Fellowship-LR 990413CONCRETE COMPRESSIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/01/1999 Report No.: 9909335 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETESUPPLIEa: LH Lacy PLACEMENT DATE: 04/01/1999 BATCHTrMm 10:35AM PLA~rr: On-site TIME SAMPLED: 10:39am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 63 F CONCRETE: 71 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Paving panels- Strips- 43, 44, 45 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.50 04/04/1999 3 67850 2400 1 2 3.50 04/08/1999 7 82110 2900 ! 3 3.50 04/08/1999 7 78300 2770 Average 2840 1 4 3.50 04/29/1999 28 1 5 3.50 04/29/1999 28 Sample location: 25' West of east form and 15' south of north form in strip #43. Note: Ail samples were sampled at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 01LL Page 1 of 3 CONCRETE COMPREoSIVE STRENGTH TES_. ENGINEF_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/01/1999 Report No.: 9909335 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke 6616 Forest Park Road Phase III - Expansion Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: LH Lacy PLACEMENT DATE: 04/01/1999 BATCH TIME: 12:25pm PLANT: On-site TIME SAMPLED: 12:30pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy/overcast STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 64 F CONCRETE: 70 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 See page 1 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.00 04/04/1999 3 68130 2410 2 2 3.00 04/08/1999 7 80750 2860 2 3 3.00 04/08/1999 7 81980 2900 Average 2880 2 4 3.00 04/29/1999 28 2 5 3.00 04/29/1999 28 Sample location: 30' East of west form and 15' south of north form in strip #44. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 3 A CONCRETE COMPRE_$IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texa~ 75247 Date of Service: 04/01/1999 Report No.: 9909335 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCm~TE SUPPLIER: LH Lacy PLACEMENT DAb:E: 04/01/1999 BATCH TreE: l:50pm PLANT: On-site TIME SAMPLED: l:55pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONdiTIONS: Clear/overcast S~RENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 64 F CONCRETE: 71 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pcO: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 8 CVLI~ER MEASURED MAXmuM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 3.00 04/04/1999 3 73150 2590 3 2 3.00 04/08/1999 7 85410 3020 3 3 3.00 04/08/1999 7 80280 2840 Average 2930 3 4 3.00 04/29/1999 28 3 5 3.00 04/29/1999 28 Sample location: 20' North of south form and 15' east of west form in Panel #45. Technician: Greg Dimock Started: 8:30am Finished: 4:00pm I'"~~urgeL~neHarbo ' Cng er~ng Inc. Report Distribution: (1) Julian P. Barry General Contractors (I) Urban Architecture (1) City of Grapevine Vice President (I) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3