Loading...
Fellowship-LR 990413 (2)CONCRETE COMPRi'- SIVE STRENGTH TEl'"' I-'BC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/31/1999 Report No.: 990924 i Report Date 04/I 3/I 999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/31/1999 BATC. TIME: 7:40am PLANT: On Site TIME SAMPLED: 7:45am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, light drizzel STRENGTH: 3000 psi @ 28 Days TEMPERATURE(F)-A~R 62 F CONCRETE: 63 g SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5% UNIT WEIGItT (pcO: 148,5 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving Strips #31, #32, #39 and #40 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 25' E of W lbrm in strip #32 REPORT OF TESTS ACCUMULATIVE YARDS: 104 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. {inches) TESTED (days) (lbs. force) {psi} TYPE I I 3.00 04/03/1999 3 67850 2400 1 2 3.00 04/07/1999 7 96370 3410 1 3 3.00 04/07/1999 7 93740 3310 Average 3360 1 4 3.00 04/28/1999 28 1 $ 3.00 04/28/1999 28 Sampled at Truck This report is exclusively lbr the use of the client indicated above and shall not be reproduccd except in full without the written approval of ItBC Engineering, Inc. 01CR Page I of 6 ,CONCRETE COMPRi SIVE STRENGTH TEl ENGINFf_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/31/1999 Report No.: 9909241 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase Ili - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PI,ACEMEN/DATE: 03/31/1999 BATCIITIME: 8:45 am PLANT: On Site TIME SAMPLED: 8:50am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATltER CONDITIONS: Cloudy, overcast STRENGTH: 3000 psi ~ 28 Days TEMPERATURE {F} - AIR 62 F CONCRETE: 64 F SLUMP: 1-3" TRUCK NO: N/A TICKEI NO: N/A AiR: 4-6% AIR CONTENT (%): 4.5% UNIT WEIGItT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ~qame as Page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 196 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 3.50 04/03/1999 3 68130 2410 2 2 3.50 04/07/1999 7 94950 3360 2 3 3.50 04/07/1999 7 86980 3080 Average 3220 2 4 3.50 04/28/1999 28 2 5 3.50 04/28/1999 28 Sample Location: 20' West of East form and 15' south of north, joint in strip ~3~ Tiffs report is exclusively for tbe use of the client iudicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01CR Page 2 of 6 · Report No.: 9909241 ~ "" I'"BC Sample in Truck This report is exclusively for the use o1' the client indicated above aod shall not be reproduced except in lull without the written approval of HBC Eogineering, Inc. 01CR Page 3 of 6 -CONCRETE COMPRL, ,SIVE STRENGTH TEk ' ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 03/31/1999 Report No.: 9909241 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain salnples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy I'LACEMENT DATE: 03/31/1999 BATClt TIME: 2:35pm PLANT: O11 Site TIME SAMPLED: 2:40pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Cloudy, overcast STRENGTH: 3000 psi ~ 28 Days TEMPERATURE (V)- AIR 57 F CONCRETE: 67 F SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% :TlR CONTENT (%): 4.25 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Y, ame as Page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 384 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTI! FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 3.00 04/03/1999 3 73150 2590 3 2 3.00 04/07/1999 7 76640 2710 3 3 3.00 04/07/1999 7 81380 2880 Average 2800 3 4 3.00 04/28/1999 28 3 5 3.00 04/28/1999 28 Sample Location: 10' West of east ~orm an~ 15' south of north form in strip ~39 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01CR Page 4 of 6 Report No.: 9909241 ~ H~ Sampled at Truck Tiffs report is exclusively lbr tbe use of the clieut iudicated above and shall not be reproduced except in full without tile written approval of ItBC Engineering, Inc. 01CR Page $ of 6 CONCRETE COMPRI JSIVE STRENGTH TEl ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/31/1999 Report No.: 990924i Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fi'esh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/31/1999 BATCH TIME: 3:10pm PLANT: On Site TIME SAMPLED: 3:15pm BY: GregDimock SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Partly cloudy STRENaTm 3000 psi ~ 28 Days TEMPERATURE (F)-AIR 59 F CONCRETE: 68 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% ^IR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 148.1 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: 5;amp as Page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 496 CYLINDER MEASURED MAXIblUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 4.00 04/03/1999 3 68450 2420 4 2 4.00 04/07/1999 7 78750 2780 4 3 4.00 04/07/1999 7 89240 3160 Average 2970 4 4 4.00 04/28/1999 28 4 5 4.00 04/28/1999 28 Technician: Greg Dimock Started: 6:00am Finished: 4:30pin Report Distribution: (1) Julian P. Barry Geueral Contractors ( 1 ) Urban Architecture Eugene.~rb-o u r (1) City o£Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval ofltBC Engineering, Inc. 01CR Page 6 of 6