Loading...
Fellowship-LR 990428 (3)CONCRETE COMPREoSIVE STRENGTH TES , ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH TIME: 7:55am PLANT: On-site TIME SAMPLED: 8:00am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Cloudy, overcast STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 F CONCRETE: 60 F SLUMP: !-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pcf): 148.1 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving - Paving Strips #27, #30, #28, .//29, #37, #38, #35, #36, #33, #34 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 112 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 3.50 04/02/1999 3 63980 2260 I 2 3.50 04/06/1999 7 102260 3620 I 3 3.50 04/27/1999 28 147750 5230 1 4 3.50 04/27/1999 28 144020 5090 Average 5160 Sample Location: 15' E from W form and 15' S of N form in Strip #27. Sample obtained at truck. This report is exclusively fl)r thc use of the client indicatcd abovc and shall nol he reproduced except in full without the written approval of H BC Engineering, Inc. 01SS Page 1 of 9 CONCRETE COMPREoSIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH TIME: 9:35am PLANT: On-site TIME SAMPLED: 9:41am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 54 F CONCRETE: 61 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WE1GIIT (pcO: 148.5 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 224 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (h~ches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.00 04/02/1999 3 83540 2950 2 2 3.00 04/06/1999 7 88810 3140 2 3 3.00 04/27/1999 28 168540 5960 2 4 3.00 04/27/1999 28 168170 5950 Average 5960 Sample Location: 10' E from W form and 15' S of N form in Strip #30. Sample obtained ac truck. This rcporl is cxclusively for the usc of thc client indicatcd above and shall not Ix: rcproduccd cxcept iii full without the written approval of HBC Engineering, Inc. 01SS Page 2 of 9 CONCRETE COMPREoSIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCHTIME: 1 l:25am PLANT: On-site TIME SAMPLED: 1 l:30am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast, light rain STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 54 F CONCRETE: 62 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (c/o): 4.25 UNIT WEIGHT (pcf): 148,9 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Sec page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 368 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 3.50 04/02/1999 3 75600 2670 3 2 3.50 04/06/1999 7 99000 3500 3 3 3.50 04/27/1999 28 139200 4920 3 4 3.50 04/27/1999 28 133290 4710 Average 4820 Sample Location: 10' W from E form and 15' S of N form in Strip ~29. Sample obtained at truck. This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS l'age 3 of 9 CONCRETE COMPRE ,$IVE STRENGTH TES_ ENG[NEER[NG, [NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCm~TESUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCHTrME: 12:35pm PLANT: On-site TIME SAMPLED: 12:40pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast, drizzle STRENaTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 56 F CONCRETE: 64 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% Am CONTENT (%): 4.5 UNIT WEIGHT (pcf): 147.3 'rEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page l. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 416 CYLINDER MEASURED MAXIMUM COMPRESSIVE MA RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 3.50 04/02/1999 3 68570 2420 4 2 3.50 04/06/1999 7 108660 3840 4 3 3.50 04/27/1999 28 124860 4420 4 4 3.50 04/27/1999 28 133480 4720 Average 4570 Sample Location: 20' W from E form in Strip #37. Sample obtained at truck. This repot! is exclnsively for the use of the client indicated above and shall not be reproduced cxccpt in full without the written approval of HBC Engineering. Inc. 01SS I'~tge 4 of 9 CONCRETE COMPRE ,$IVE STRENGTH TES_.. ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH TIME: 1:20pm PLANT: On-site T1MESAMPLED: l:27pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER COm)ITIONS: Cloudy, light rain STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 56 F CONCRETE: 64 V SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 147.7 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUmJrATIVE YAR~S: 520 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 4.00 04/02/1999 3 68720 2430 5 2 4.00 04/06/1999 7 96470 3410 5 3 4.00 04/27/1999 28 133180 4710 5 4 4.00 04/27/1999 28 133950 4740 Average 4730 Sample Location: 15' W from E form in Strip #38. Sample eb~ained at truck. This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without thc wrinen approval of HBC Engineering, Inc. 01SS Page 5 of 9 CONCRETE COMPREoSIVE STRENGTH TLS_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 99091 l0 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement Locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH T~ME: 2: 15pm PLANt: On-site TIME SAMPLED: 2:20pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy, drizzle STRENGTH: 3000 psi @ 28 Days IEMPERATURE (F)- AIR 56 F CONCRETE: 61 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENt (%): 4.5 UNIT WEIGHT (pcf): 147.3 TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Sec page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 624 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 I 3.50 04/02/1999 3 58740 2080 6 2 3.50 04/06/1999 7 82340 2910 6 3 3.50 04/27/1999 28 146630 5190 6 4 3.50 04/27/1999 28 139390 4930 Average 5060 Sample Location: 12' W from E form in Strip #35. Sample obtained at truck. This report is exclusively for the use of thc client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Pa?,e 6 of 9 CONCRETE COMPREoSIVE STRENGTH TES.. ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUI'PLIER: L.H. Lacy PLACEMENT hATE: 03/30/1999 BATCH TIME: 3:00pm PLANT: On-site TIME SAMPLED: 3:05pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, steady rain STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 F CONCRETE: 63 ~ SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.25 UNIT WEIGHT (pcf): 147.3 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 728 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 7 1 3.50 04/02/1999 3 58420 2070 7 2 3.50 04/06/1999 7 81640 2890 7 3 3.50 04/27/1999 28 141290 5000 7 4 3.50 04/27/1999 28 145650 5150 Average 5080 Sample Location: 10' W from E form in Strip #36. Sample obtained at truck. This report is exclusively Ibr thc use of the client indicated above and shall not be reproduced except in full without thc written approval of ttBC Engineering, Inc. 01SS Page 7 of 9 CONCRETE COMPRE,.,SIVE STRENGTH TLS_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETESUPPL1ER: L.H. Lacy PLACEMENT DATE: 03/30/1999 aATCHTIME: 3:35pm PLANT: On-site TIME SAMPLED: 3:40pm aY: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Cloudy, rain STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 g CONCRETE: 64 F SLUMP: !-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pcf): 147.7 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVEYAm~S: 832 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 8 1 3.50 04/02/1999 3 59320 2100 8 2 3.50 04/06/1999 7 86940 3070 8 3 3.50 04/27/1999 28 131980 4670 8 4 3.50 04/27/1999 28 136050 4810 Average 4740 Sample LocaEion: 50' W of E form in SErip #33 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ISS Page 8 of 9 CONCRETE COMPRE ,$IVE STRENGTH TES. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/28/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH TIME: 3:40pm PLANT: On-site TIME SAMPLED: 3:46pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, drizzle STRENGTm 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 F CONCRETE: 62 ~ SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 148.5 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below For sample location REPORT OF TESTS ACCUMULATIVE YARDS: 888 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 9 I 3.50 04/02/1999 3 70890 2510 9 2 3.50 04/06/1999 7 93440 3300 9 3 3.50 04/27/1999 28 135040 4780 9 4 3.50 04/27/1999 28 140310 4960 Average 4870 Sample Location: 20' W from E form and 15' S of N form in Strip #34. Sample ebtained at truck. Technician: Greg Dimock Started: 6:00am Finished: 5:30pm ~ Engine~ Report Distribution: ( I ) Julian P. Barry General Contractors ( 1 ) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President ( I ) City ol' Coppel[ This report is exclusively for the use oftbe client indicated above and shall not be reproduced except in full without the written approval of HBC Eugineering, Inc. 01SS Page 9 of 9