Fellowship-LR 990413 (3)CONCRETE COMPRL ,SIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 aATCIITIME: 7:55am PLANT: On-site TIME SAMPLED: 8:00am aY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONmTIONS: Cloudy, overcast STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 F CONCRETE: 60 F SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pet): 148.1 TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: Paving - Paving Strips #27, #30, #28, #29, #37, #38, #35, #36, #33, #34 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 1 12 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.50 04/02/1999 3 63980 2260 1 2 3.50 04/06/1999 7 102260 3620 1 3 3.50 04/27/1999 28 1 4 3.50 04/27/1999 28 Sample Location: 15' E from W form and 15' S of N form in Strip #27. Sample obtained at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 1 of 9 CONCRETE COMPRE ,SIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH TIME: 9:35am I'LANT: On-site TIME SAMPLED: 9:41am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATtlER CONDITIONS: Cloudy, overcast STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 54 V CONCRETE: 61 g SLtrM~: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pcf): 148.5 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 224 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.00 04/02/1999 3 83540 2950 2 2 3.00 04/06/1999 7 88810 3140 2 3 3.00 04/27/1999 28 2 4 3.00 04/27/1999 28 Sample Location: 10' E from W form and 15' S of N form in Strip #30. Sample obtained at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 2 of 9 CONCRETE COMPRESSIVE STRENGTH TES_-' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Ciient No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCII TIME: 1 l:25am PLANT: On-site TIME SAMPLED: 1 l:30am aY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast, light rain STRENGTH: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 54 F CONCRETE: 62 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.25 UNIT WEIGHT (pcf): 148.9 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YAm>S: 368 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 3.50 04/02/1999 3 75600 2670 3 2 3.50 04/06/1999 7 99000 3500 3 3 3.50 04/27/1999 28 3 4 3.50 04/27/1999 28 Sample Location: 10' W from E form and 15' S of N form in Strip #29. Sample obtained at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 3 of 9 CONCRETE COMPREoSIVE STRENGTH TES_ ENGINEERING, 1NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCHTIME: 12:35pm PLANT: On-site TIME SAMPLED: 12:40pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, overcast, drizzle STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)-AIR 56 F CONCRETE: 64 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 147.3 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE Yam)s: 416 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 3.50 04/02/1999 3 68570 2420 4 2 3.50 04/06/1999 7 108660 3840 4 3 3.50 04/27/1999 28 4 4 3.50 04/27/1999 28 Sample Location: 20' W from E form in Strip #37. Sample obtained at truck. This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full wi~thout the written approval of HBC Engineering, Inc. 01SS Page 4 of 9 CONCRETE COMPREoSIVE STRENGTH TES ENGINEF_RII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH TIME: 1:20pm PLANT: On-site TIME SAMPLED: l:27pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Cloudy, light rain STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 56 F CONCRETE: 64 F SLUMP: 1-3" TRUCKNO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 147.7 TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page I. ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 520 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 4.00 04/02/1999 3 68720 2430 5 2 4.00 04/06/1999 7 96470 3410 5 3 4.00 04/27/1999 28 5 4 4.00 04/27/1999 28 Sample Location: 15' W from E form in Strip #38. Sample obtained at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 5 of 9 CONCRETE COMPREoSIVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH T~ME: 2: 15pm PLANT: On-site TIME SAMPLED: 2:20pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, drizzle STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 56 F CONCRETE: 61 F SLUMP: 1-3" TRUCKNO: N/A TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 147.3 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 624 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 3.50 04/02/1999 3 58740 2080 6 2 3.50 04/06/1999 7 82340 2910 6 3 3.50 04/27/1999 28 6 4 3.50 04/27/1999 28 Sample Location: 12' W from E form in Strip #35. Sample obtained at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 6 of 9 CONCRETE COMPRE,_,SIVE STRENGTH TES. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 03/30/1999 Report No.: 9909110 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Coppell, Texas Dallas TX 75235 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLmR: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCIt TreE: 3:00pm PLANT: On-site TIME SAMPLED: 3:05pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, steady rain STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 F CONCRETE: 63 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.25 UNIT WEIGHT (pcf): 147.3 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I. ASTM C- ! 72 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 728 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 7 1 3.50 04/02/1999 3 58420 2070 7 2 3.50 04/06/1999 7 81640 2890 7 3 3.50 04/27/1999 28 7 4 3.50 04/27/1999 28 Sample Location: 10' W from E form in Strip #36. Sample obtained at truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 7 of 9 CONCRETE COMPRLoSIVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: C.H. Lacy PLACEMENT DATE: 03/30/1999 BATCh TIME: 3:35pm PLANT: On-site TIME SAMPLED: 3:40pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, rain STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 F CONCRETE: 64 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pcf): 147.7 TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1. ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YAR~S: 832 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE $ 1 3.50 04/02/1999 3 59320 2100 8 2 3.50 04/06/1999 7 86940 3070 8 3 3.50 04/27/1999 28 8 4 3.50 04/27/1999 28 Sample Location: 50' W of E form in Strip #33 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 8 of 9 CONCRETE COMPR SIVE STRENGTH TES I--Be ENGINEERRqG, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/30/1999 Report No.: 9909110 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/30/1999 BATCH TIME: 3:40pm PLANT: On-site TIME SAMPLED: 3:46pm aY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, drizzle STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 53 F CONCRETE: 62 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO.' N/A AIR: 4-6% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): 148.5 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1. ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACCUMULATIVE YARDS: 888 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 9 1 3.50 04/02/1999 3 70890 2510 9 2 3.50 04/06/1999 7 93440 3300 9 3 3.50 04/27/1999 28 9 4 3.50 04/27/1999 28 Sample Location: 20' W from E form and 15' S of N form in Strip #34. Sample obtained at truck. Technician: Greg Dimock Started: 6:00am Finished: 5:30pm ~ E 'n~ Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour ( 1 ) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 9 of 9