Loading...
Fellowship-LR 990426 (4)CONCRETE COMPREoSIVE STRENGTH TES. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCH TIME: N/A PLANT: On site TIME SAMPLED: 8:00am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- Am 54 F CONCRETE: 60 F SLUMP: i-3" TRUCK NO: Load6 TICKETNO: N/A AIR: 4-6% AIR CONTENT (%): 1.8 UNIT WEIGHT (pti'): 15 1.2 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Lane 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 90' E from W header REPORT OF TESTS ACCUMULATIVE YARDS: 48 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 2.75 03/29/1999 4 84120 2970 1 2 2.75 04/01/1999 7 86150 3050 1 3 2.75 04/01 / 1999 7 88480 3130 Average 3090 I 4 2.75 04/22/1999 28 153550 5430 1 5 2.75 04/22/1999 28 150670 5330 Average 5380 This report is exclusively for thc use of the client indicaled above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page I of 9 'CONCRETE COMPRLoSIVE STRENGTH TES. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 CiientNo.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIEI~: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCH TrME: N/A PLANT: On site TIME SAMPLED: 9:30am ~¥: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 56 F CONCRETE: 60 F SLUMP: 1-3" TRUCK NO: N/A TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.1 UNIT WEIGHT (pcf): 147.8 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Lane 2 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 75' W from E header REPORT OF TESTS ACCUMULATIVE YARDS: 160 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.00 03/29/1999 4 61240 2170 2 2 3.00 04/01/1999 7 88480 3130 2 3 3.00 04/01/! 999 7 82780 2930 Average 3030 2 4 3.00 04/22/1999 28 108230 3830 2 5 3.00 04/22/1999 28 113360 4010 Average 3920 This report is exclusively for the usc of the client indicalcd above and shall not bc reproduced except in full without thc written approval of HBC Engineering, Inc. 01TM Page 2 of 9 CONCRETE COMPRLoSIVE STRENGTH TES l 8901 Carpenter Frwy., Suite #100 Dalla% Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCH TIME: N/A PLANT: On site TIME SAMPLED: 1 l:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Fair STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 65 F CONCRETE: 65 F SLUMP: 1-3" TRUCK NO: Load35 TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 5.2 UNIT WEIGHT (pcf): 146.5 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Lane 3 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 80' W from E header REPORT OF TESTS ACC UMULATIVEYARDS: 280 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 3.00 03/29/1999 4 67410 2380 3 2 3.00 04/01/1999 7 82780 2930 3 3 3.00 04/01/1999 7 78300 2770 Average 2850 3 4 3.00 04/22/1999 28 119870 4240 3 5 3.00 04/22/1999 28 I 13080 4000 Average 4120 This report is exclusively for the use of the client indicalcd above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 3 of 9 CONCRETE COMPRLoSIVE STRENGTH TES ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCII TIME: PLANT: On site TIME SAMPLED: 12:00pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 67 F CONCRETE: 66 E SLUMP: 1-3" TRUCK NO: Load50 TICKET NO: AIR: 4-6% AIR CONTENT (%): 5.3 UNIT WEIGHT (pcf): 145.3 TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Lane 4 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 100' E from W header REPORT OF TESTS ACCUMULATIVE YARDS: 400 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 3.00 03/29/1999 4 59940 2120 4 2 3.00 04/01 / 1999 7 78450 2770 4 3 3.00 04/01/1999 7 80160 2830 Average 2800 4 4 3.00 04/22/1999 28 98950 3500 4 5 3.00 04/22/1999 28 104590 3700 Average 3600 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. I)ITM Page 4 of 9 CONCRETE COMPRL SIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCH TIME: N/A eLA~rr: On site TIME SAMPLED: l:00pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Fair STRENGTH: 3000 psi @ 28 Days TEMPERATURE (r)- AIR 67 E CONCRETE: 67 V SLUMP: 1-3" TRUCK NO: Loan64 TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.4 UNIT W~IGUT (pcf): 146.0 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Lane 5 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 100' E from W header REPORT OF TESTS ACCUMULATIVE YARDS: 510 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (htches) TESTED (days) (lbs. force) (psi) TYPE 5 1 2.50 03/29/1999 4 66580 2350 5 2 2.50 04/01/1999 7 83690 2960 5 3 2.50 04/01 / 1999 7 87100 3080 Average 3020 5 4 2.50 04/22/1999 28 119740 4230 5 5 2.50 04/22/1999 28 l 16180 4110 Average 4170 This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 5 of 9 CONCRETE COMPRL._,SIVE STRENGTH TES. ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCH TrME: N/A PLANT: On site TIME SAMPLED: 2:00pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGT}{: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 70 F CONCRETE: 68 F SLUMP: 1-3" TRUCK NO: Load78 TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 3.9 UNIT WEIGHT (pcf): 149.2 TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Lane 6 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 60' W from E Header REPORT OF TESTS ACCUMULATIVE YARDS: 624 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 2.25 03/29/1999 4 76360 2700 6 2 2.25 04/01/1999 7 94780 3350 6 3 2.25 04/01/1999 7 90180 3190 Average 3270 6 4 2.25 04/22/1999 28 [ 19010 4210 6 5 2.25 04/22/1999 28 [ 21840 4310 Average 4260 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. t! I TM Page 6 of 9 CONCRETE COMPREoSIVE STRENGTH TES. ENGINFY_.RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCH TIME: N/A PLANT: On site TIME SAMPLED: 3:20pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)-AIR 68 F CONCRETE: 68 F SLUMP: 1-3" TRUCK NO: Loan92 TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.6 UNIT WEIGHT (pcf): 143 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Lane 8 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 45' E from W Header REPORT OF TESTS ACCUMULATIVE YARDS: 736 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 7 I 2.50 03/29/1999 4 75140 2660 7 2 2.50 04/01/1999 7 85650 3030 7 3 2.50 04/01/1999 7 96680 3420 Average 3230 7 4 2.50 04/22/1999 28 128060 4530 7 5 2.50 04/22/1999 28 123530 4370 Average 4450 This report is exclusively for the use of the ellen! indicaled above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0 ITM Page 7 of 9 CONCRETE COMPREoSIVE STRENGTH TLS- ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dalla% Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke 6616 Forest Park Road Phase III - Expansion Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPeLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCH T~ME: N/A PLANT: On site TIME SAMPLED: 4:40pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 68 F CONCRETE: 67 F SLUMP: 1-3" TRUCK NO: 107 TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.7 UNIT WEIGHT (pcf): 146 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Lane 7 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 35' W from E Header REPORT OF TESTS ACCUMULATIVE YAm)S: 856 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 8 1 2.25 03/29/1999 4 92070 3260 8 2 2.25 04/01/1999 7 109610 3880 8 3 2.25 04/01/1999 7 98660 3490 Average 3690 8 4 2.25 04/22/1999 28 159880 5650 8 5 2.25 04/22/1999 28 164240 5810 Average 5730 This report is exclusively fi)r the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 8 of 9 CONCRETE COMPREoSIVE STRENGTH TES. ENGINEERI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/25/1999 Report No.: 9908654 Report Date 04/26/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: FC-M CONCRETE SUPPLIER: L.H. Lacy PLACEMENT DATE: 03/25/1999 BATCHTIME: N/A PLANT: On site TIME SAMPLED: 5:30pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTI{: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 67 E CONCRETE: 67 ~ SLUMP: 1-3" TRUCK NO: 123 TICKET NO: N/A AIR: 4-6% AIR CONTENT (%): 4.9 UNIT WEIGHT (pcf): 146.2 TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Lane 10 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 30' E from W Header REPORT OF TESTS ACCUMULATIVE YARDS: 984 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 9 1 2.75 03/29/1999 4 57040 2020 9 2 2.75 04/01/1999 7 97450 3450 9 3 2.75 04/01/1999 7 87910 3110 Average 3280 9 4 2.75 04/22/1999 28 113180 4000 9 5 2.75 04/22/1999 28 109400 3870 Average 3940 Technician: Mike Odom Started: 6:00am Finished: 6:30pm ~ Enginoori~e~~'~ Report Distribution: ( 1 ) Julian P. Barry Gcncral Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President ( 1 ) City of Coppell This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OITM Page 9 of 9