Fellowship-LR 990324REPORT OF SOIL-LIME MIXTURE PULVERIZATION
8901 Carpenter Finny., Suite 100
Da/las. Texas 75247
Date of Service: 03/24/99 Report No.: 9908531
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
6616 Forest Park Rd. Phase III - Expansion
Dallas, Texas 75235 Coppell, Texas
Contractor: Specification Requirements:
Test Location: Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
Test Method: NTCOG
1-3/4" Sieve #4 Sieve
Test No. Location %Pass % Pass
1 Grid line 475W/650S 100 70
2 Grid line 300W/790S 100 65
3 Grid line 500W/750S 100 62
4 Grid line 290W/875S 100 69
5 Grid line 490W/800S 100 66
6 Grid line 295W/910S 100 70
7 Grid line 475W/450S 100 66
8 Grid line 300W/550S 100 64
9 Grid line 60W/715S 100 69
10 Grid line 250N/20W 100 67
Technician: R. Montgomery Started: 11:00 am Stopped: 12:30 pm
Report Distribution: Engineerin_g, Inc.
(1) Julian P. Barry General Contractors
(I) Urban Architecture
(I) City of Grapevine
(1) City of Coppell
Vice President
309ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.