Fellowship-LR 990323REPORT OF SOIL-LIME MIXTURE PULVERIZATION
8901 Carp~ter Frw7., Suite lO0
Dallas, Tex~ 75247
Date of Service: 03/23/99 Report No.: 9908435
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
6616 Forest Park Road Phase III - Expansion
Dallas, Texas 75235 Coppell, Texas
Contractor: Specification Requirements:
Test Location: Parking Area & Fire Lane Minimum Passing I 3/4" Sieve: 100%
Minimum Passing ~t4 Sieve: 60%
Sample Condition: Field Moist
Test Method: NTCOG
1-3/4" Sieve #4 Sieve
Test No. Location %Pass % Pass
1 Parking, Grid I00W/480S 100 65
2 Parking, Grid 100W/550S 100 73
3 Fire Lane, Grid 20W/475 S 100 68
4 Fire Lane, Grid 25W/250S 100 68
5 Fire Lane, Grid 200W/25 S 100 67
6 Fire Lane, Grid 450W/25S 100 66
7 Parking, Grid 400W/400S 100 67
8 Parking, Grid 220W/600S 100 67
9 Parking, Grid 450W/595S 100 64
10 Parking, Grid 250W/675 S 100 63
11 Parking, Grid 610W/475 S 100 64
12 Parking, Grid 750W/21 OS 100 62
Technician: R. Montgomery Started: See Report #9908491
Report Distribution: H~ .
_ng,Engineeri Inc.
(1) Julian P. Barry General Contractors ~
( 1 ) Urban architecture
(1) City of Grapevine
(1) City of Coppell e. ugene Harbour
Vice President
309ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.