Fellowship-LR 990318REPORT OF SOIL-LIME MIXTURE PULVERIZATION
ENGINEERING, INC.
8901 Carpenter Frwy., Suite 100
Dallas, Texas 75247
Date of Service: 03/18/99 Report No.: 9907988
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
6616 Forest Park Road Phase III - Expansion
Dallas, Texas 75235 Coppell, Texas
Contractor: Specification Requirements:
Test Location: Parking Area Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
Test Method: NTCOG
1-3/4" Sieve #4 Sieve
Test No. Location %Pass % Pass
1 Gridline, 100W/45S 100 69
2 Gridline, 100W/100S 100 62
3 Gridline, 90W/150S 100 68
4 Gridline, 100W/2005 100 70
5 Gridline, 100W/250S 100 70
6 Gridline, 125W/300S 100 75
7 Gridline, I00W/350S 100 63
8 Gridline, 150W/400S 100 64
Technician: R. Montgomery Started: See Report #9908038
Report Distribution: ~ Engineering, Inc.
(1) Julian P. Barry General Contractors ~
( 1 ) Urban Architecture
(1) City of Grapevine
(I) City of Coppell Eugene Harbour
Vice President
309ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.