Loading...
Fellowship-LR 990318REPORT OF SOIL-LIME MIXTURE PULVERIZATION ENGINEERING, INC. 8901 Carpenter Frwy., Suite 100 Dallas, Texas 75247 Date of Service: 03/18/99 Report No.: 9907988 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas 6616 Forest Park Road Phase III - Expansion Dallas, Texas 75235 Coppell, Texas Contractor: Specification Requirements: Test Location: Parking Area Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NTCOG 1-3/4" Sieve #4 Sieve Test No. Location %Pass % Pass 1 Gridline, 100W/45S 100 69 2 Gridline, 100W/100S 100 62 3 Gridline, 90W/150S 100 68 4 Gridline, 100W/2005 100 70 5 Gridline, 100W/250S 100 70 6 Gridline, 125W/300S 100 75 7 Gridline, I00W/350S 100 63 8 Gridline, 150W/400S 100 64 Technician: R. Montgomery Started: See Report #9908038 Report Distribution: ~ Engineering, Inc. (1) Julian P. Barry General Contractors ~ ( 1 ) Urban Architecture (1) City of Grapevine (I) City of Coppell Eugene Harbour Vice President 309ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.