Loading...
Fellowship-LR 990405IN-PLACE DENSITY -"STING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/18/1999 Report No.: 9908038 Report Date 04/05/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: PROJECT DATA CONTRACTOR: Julian P. Barry Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSYI'Y RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture De,sity I Dk brn silty cl (lime treated) 29.5 89.0 -1/+3% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pc0 (% max) Parking Area Subgrade 55 Final Lift, Grid line 150W/50S I 29.6 88.5 99 56 Final Lift, Grid line 50W/100S 1 29.8 88.9 100 57 Final Lift, Grid line 150W/150S 1 32.7* 85.5 96 58 Final Lift, Grid line 200W/200S 1 30.6 86.4 97 59 Final Lift, Grid line 175W/250S I 31.8 87.0 98 An asterisk (*) appears next to test results which do NOT meet the project specifications. Technician: Roy Montgomery / L/~, E , Inc. Report Distribution: ~llg ( I ) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President ( I ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. (}TI'MP Page 1 of 1