Loading...
Fellowship-LR 990319IN-PLACE DENSITY_ STING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/17/1999 Report No.: 9907890 Report Date 03/19/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: In-place density testing. PROJECT DATA CONTRACTOR: Julian P. Barry Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dark brown silty clay 29.5 89.0 -1/+3% 95% (lime treated) FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. ( % ) (pcf) (% max) 48 Final Lift, Grid line 475 N/50W 1 29.5 86.9 98 49 Final Lift, Grid line 350 N/110 W 1 29.9 88.4 99 50 Final Lift, Grid line 420 N/175 W 1 31.2 84.6 95 51 Final Lift, Grid line 340 N/210 W 1 32.1 85.8 96 52 Final Lift, Grid line 475 N/275 W 1 29.8 88.1 99 53 Final Lift, Grid line 375 N/340 W 1 30.5 86.8 98 54 Final Lift, Grid line 425 N/390 W 1 31.2 85.6 96 Test results on this report meet project specification. Technician: Roy Montgomery ~ E~ Inc. Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture E~e Harbour (1) City of Grapevine Vice President ( 1 ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07CR Page 1 of 1