Fellowship-LR 990319IN-PLACE DENSITY_ STING
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 03/17/1999 Report No.: 9907890 Report Date
03/19/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: In-place density testing.
PROJECT DATA
CONTRACTOR: Julian P. Barry Laboratory Test Method: ASTM D-698
Field Test Method: ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Dark brown silty clay 29.5 89.0 -1/+3% 95%
(lime treated)
FIELD DENSITY TESTS
TEST M/D MOISTURE DRY DENSITY DENSITY
NO TEST LOCATION No. ( % ) (pcf) (% max)
48 Final Lift, Grid line 475 N/50W 1 29.5 86.9 98
49 Final Lift, Grid line 350 N/110 W 1 29.9 88.4 99
50 Final Lift, Grid line 420 N/175 W 1 31.2 84.6 95
51 Final Lift, Grid line 340 N/210 W 1 32.1 85.8 96
52 Final Lift, Grid line 475 N/275 W 1 29.8 88.1 99
53 Final Lift, Grid line 375 N/340 W 1 30.5 86.8 98
54 Final Lift, Grid line 425 N/390 W 1 31.2 85.6 96
Test results on this report meet project specification.
Technician: Roy Montgomery ~ E~ Inc.
Report Distribution:
(1) Julian P. Barry General Contractors
(1) Urban Architecture E~e Harbour
(1) City of Grapevine Vice President
( 1 ) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07CR Page 1 of 1